Please enable JavaScript.
Coggle requires JavaScript to display documents.
MODULAR INTERLOCKING PREVIOUS TILES (for footpaths) - Coggle Diagram
MODULAR
INTERLOCKING
PREVIOUS TILES
(for footpaths)
1.PROBLEM
CONTEXT &
OBJECTIVES
PEDESTRIAN HAZARDS
SLIP & FALL RISK
INFRASTRUCTURE FAILURE
PUDDLES
CORE SOLUTION METRICS
ZERO SURFACE WATER
MATERIAL MIX &
COMPOSITION
PREVIOUS CONCRETE MATRIX
GAP GRADED
SUSTAINABILITY FOOTPRINT
WASTE DIVERSION
STRUCTURAL
GEOMETRY &
ENGINEERING
FEATURES
INTERLOCKING MECHANISM
LOAD DISTRIBUTION
SURFACE LAYER
TEXTURE
SUB-SURFACE DRAINAGE
SILT PREVENTIONS
PROTOTYPING.
MOLD CREATION
3D PRINTED MASTERS
PROTOTYPE TESTING
COMPRESSIVE TEST