Please enable JavaScript.
Coggle requires JavaScript to display documents.
Definitions - Coggle Diagram
Definitions
DP Vessel
Automatically maintain
Position
and/ or
Heading
Só Position sem Heading
Só Heading sem Position
Position e Heading
Thruster System
All components
that supply DP system
Thrusters
Main Propeller and Rudder
IF UNDER DP SYSTEM CONTROL
Company
eg:
Manager
Bareboat charterer
Owner
Has responsibility
for Operation
DPVAD
DP Verification Acceptance Document
Document issue by Administration
that VESSEL complies with this IMO
Failure
Loss of
Component or System function
Deterioration of capability
Reduce safety of
Vessel
Personnel
Environment protection
Activity-Specific Operation Guidelines (ASOG)
Guidelines on Performance Limits
Bus-tie breaker
Device Connecting/Disconnecting
Closed Bus-tied is Connected
Consequence Analysis
Software Function
Continuously verify
if vessel remains in position
Worst-Case Failure
The Single Fault
Maximum Detrimental Effect on DP
DP Operation
Control AUTOMATICALY at Least
2 DOF in the HORIZON PLANE