KPI F1 Availability (2 Units) (Outside >28.5 Days) - Coggle Diagram
KPI F1 Availability (2 Units)
(Outside >28.5 Days)
Risk of incomplete execution
Compliance Concern
Safety / Moderate
Major Incident
Hydrogen House Explosion with Fatality
IN23-H2 gas pressure regulator leak passing
Generator Explosion with Fatality
Boiler Explosion with Fatality
IN23-Unit 2 Boiler has LPG gas leak inside the furnace during lunchtime
IN23 Blue sheet get fire at unit 2 AH-B from welding work
Fatal Work-Related Accident
Confined Space Work
Work at Hight
IN22-Unit 1 Instant upright's part falling down during removal.
Hot Work
Diving Work (งานดำน้า)
Turbine large fire
Smoke at the insulation steam turbine valve during start-up. Sep-2024
Coal Handling Large Burn
Belt No.1, 2 and Tripper Floor
IN23 Tripper car A's travel shaft M-01 was broken
Pulverizer Explosion (PPI)
IN23-Unit 2 Pulv-B inlet primary hot air control damper failed to control
Environmental / Moderate
Stack Emission exceed Thai Law
Particulate Emission Exceed Thai Law Limit
ESP Failure >> 2 Sections
IN22 Unit 1 ESP B1-1S HV transformer tripped.
Coal burning program cause of over control limit
IN23-Unit 2 Stack Opacity reading shown zero %
SiO2 Emission Exceed Thai Law
FGD System Failure
Treated Water Quality Exceed Limit
Coal Yard Treated Water Exceed Thai Law discharge to Sea
Coal contaminates with storm water discharge to Sea
IN23-Water flood over the drainage system while heavy rain
Waste Treatment Water Exceed Thai Law discharge to Sea
Major Chemical Spill
H2SO4 Tank Broken
Operational Concern
Turbine
Significant
Feed Pump / BFP Failure
Moderate
Jellyfish Attack
Turbine High Pressure Valve (MSV, RSV GV, ICV) Stick
Heat Exchanger Failure
IN23-Unit 2 HPHTR No.6 (High-Pressure Heater) tube leakage
IN23-Unit-2 Condenser tube leakage
IN23-Unit 2 HPHTR No.7 (High Pressure Heater) tube leakage.
Cross Over Pipe Leakage
Turbine Water Ingress (PPI)
IN23-Unit 2 Sponge clog inside IP Turbine inlet drain blow valve line
Materail Handling
Significant
Pulverizer / Coal Feeder Failure
Moderate / Incident
Stacker Reclaimer Failure
IN23-Stacker reclaimer No.2 motor gantry No.13 abnormal
Belt Conveyer Failure
IN23 BC-8A Conveyor belt sling and surface damaged around 30 M
IN21-Belt conveyor No. 3 has got a burn mark on the belt surface
Coal Bunker
IN22 A small aluminum shovel fell in Unit 2 coal bunker-B
Boiler
Significant
Boiler Tube Leakage
IN23-Unit 2 adjust burner drive air fail lock
Moderate
DCC Failure
IN23-Unit-1 DCC V-Plate liner damage
Fan / Air Heater / Air System Failure
ESP Failure
High Pressure Valve Leakage
Fly Ah Silo Failure
IN21 Ash blockage at dry ash loading line-A,B at fly ash silo unit 1
Operation/Planning / Moderate
Mandatory Test
Main Stem Valve Freedom Test Unit 2 spend time 37 minutes/time
Y2027
Every 2 Week (include Outage 1 times) = 25 times x 37 minutes = 925 min / 15.42 hr.
Every 3 Week = 18-times x 37 minutes = 666 min / 11.10 hrs
Every 4 Week = 13-times x 37 minutes = 481 min / 8.02 hr.
Every Week (include Outage 3 times) = 49-times x 37 minutes = 1,813 min / 32.22 hrs.
Main Stem Valve Freedom Test Unit 1 spend time 37 minutes/time
Unit Support Operation
Any Unit supports Shutdown Operation spending time 45 minutes
Any Unit supports Start Up Operation spending time 80 minutes
Planned Outage
Unit 1 MI Planned Outage Hour = 442 hrs. 18.42 Days
Unit 2 MI Planned Outage Hour = 528 hrs. 22 Days
Dispatch Deviation
Operation Improper Declaration
Emergency Shutdown
MTT Tank fired
Operation Environmental / External Constraint issued
Emission Exceed Limit
Generator/Electricity
Moderate
500kV/11kV/400V SWGR Failure
IN-23 PDG Line No.1 PLC PTT,DTT carrier failed
IN23-110V BATTERY FOR 500KV SUBSTATION got heat and electrolyte solution blow out.
IN22-Unit-1 EP Switchgear-A incoming (GS041) failure
11kV Motor Failure
Generator / Exciter /Transformer Failure
IN21-Unit 2 tripped from the Generator transformer Buchholz relay of trip command.
IN21-Start up Transformer phase A tripped by 87C operated.
RTU Failure
Coal Contract Concern
Coal Supply Default by Supplier / Moderate
Coal Delivery Suspension Due to Market Price Discrepancy
Force Majeure Event: Mine Flooding from Storm
CAH 2 Units
Unit 1 CAH 7,943 x 673.25 = 5,347,625 GWh
Yearly Available Hour = 8760 hrs.
Planned Outage Hour = 442 hrs. 18.42 Days
13-Jun-27 to 1-Jul-27
Inside Contracted Available Hour = 7,943 hrs. 331 days
Contingency Hour = 375 hrs. 15.62 Days
Unit 2 CAH 7,887 x 673.25 = 5,309,923 GWh
Yearly Available Hour = 8760 hrs.
Planned Outage Hour = 528 hrs. 22 Days
18-Jul-27 to 9-Aug-27
Inside Contracted Available Hour = 7,887 hrs. 328.62 Days
Contingency Hour = 345 hrs. 14.37 Days
How to Achieved CAH
Yearly Available Hour = 8760 hrs.
Inside Contracted Available Hour = 7,943 hrs. 331 days
Contingency Hour = 375 hrs. 15.62 Days
Planned Outage Hour = 442 hrs. 18.42 Days
13-Jun-27 to 1-Jul-27
Cross-Functional support KPI by Smart Goal
Level 3
Procurement
วิเคราะห์แผนการใช้งาน Critical Spare part เพื่อวางแผนสั่งซื้อล่วงหน้า ส่งมอบให้ทันแผนการใช้งานในช่วง Outage โดยทำงานร่วมกับ Engineer เพื่อวางแผนล่วงหน้า
Government Ralations
สนับสนุนข้อมูลประสานงานกับหน่วยงานภาครัฐ
Human Resources & Administration
วางแผนและดำเนินการสนับสนุน Outage ให้มีประสิทธิภาพและมีค่าใช้จ่ายลดลง เพื่อให้ครบ CAH ให้ Outage เสร็จตามแผน
Safety and Health
กำกับดูแลพนักงาน และ ผรม. ทำงานอย่างปลอดภัย เพื่อให้โรงงานเดินหน้าต่อ
IT Support
Provide AI Knowledge
Commercial
Smooth CAH achicment Moniotor และทำให้ไม่เกิดค่าปรับ Unplan Outage
Risk & Insurance
Support การ Claim insurance กรณีที่เครื่องจักรเกิด loss เพื่อลดผลกระทบทางการเงิน
Instrumentation Control and Technology
ควบคุมตรวจสอบแผนงานบำรุงรักษาประจำปี ให้สำเร็จตามที่วางแผนไว้
Level 2
Material Handling Maintenance
วางแผนซ่อมบำรุงให้สอดคล้อง กับแผนการเดินเครื่อง
Chemistry
ส่งมอบผลการวิเคราะห์ถ่านหิน เพื่อให้วางแผนการ Blending ได้ถูกต้อง และมีประสิทธิภาพ
Technical Services
ทำเครื่องมือประเมินปริมาณถ่านหินคงเหลือให้แม่นยำ
Planning and Outage Management
วางแผนงาน Outage ตาม Strategy: Utilities 80% PPA Window เพื่อให้ได้วันในการขายไฟ OCAH มากที่สุด โดยยังคงรักษา reliability ของ Plant ได้
Level 1
Operations Support
สนับสนุนการจัดทำงบประมาณ ประจำปีของหน่วยงาน OPS เพื่อให้สามารถเดินเครื่องได้อย่างต่อเนื่อง
Environment and Sustainability
สนับสนุนด้านกฎหมาย ข้อกำหนดด้านสิ่งแวดล้อม ทั้งการทบทวน สร้างความเข้าใจ กรณีมีการเปลี่ยนแปลงเพื่อให้การเดินเครื่องทำได้อย่าง Smooth
Engineering Support
Condition monitor เครื่องจักรสำคัญได้อย่างครอบคลุม เพื่อไม่ให้เกิด Breckdown กระทบต่อ PPA
Electrical Power System and Technology
ดำเนินการส่งมอบเครื่องจักรให้แผนก Operation โดยมีคุณภาพและภายใต้เวลาที่กำหนด
Plant Operations
Plant reliability (Outage) /Availability (PM.)
Turbine
จัดทำแผนงานซ่อมบำรุง อุปกรณ์สำคัญพร้อมทั้งงบประมาณการซ่อมใน PPA ที่เหลือ เพื่อเป็นการใช้งบประมาณให้เกิดผลประโยชน์สูงสุด
Material Handling Planning
วางแผนการใช้ถ่าน (Burning) ให้เพียงพอ และไม่กระทบกับ Plant availabity
Boiler
ดำเนินการซ่อมให้ Plant มี Reliability เกิน 12,000 hrs และเสร็จภายใน Outage plan
Champion Roles & Responsibilities
Sponser
Provide strategic direction
Ensure alignment with organizational goals
Provide recommendations and make decisions on critical issues
Support cross-functional coordination
Monitor overall progress
Champion & Grade A, B C
Drive the development of the relevant Business Plan
Understand the assigned business objectives
Communicate objectives to relevant departments
Verify the linkage and coherence of the plans
Track the progress of the plans
Report critical issues to the Sponsor
Alignment between executives and relevant departments