Baba's Home
D. Finishing
- Electrical and Mechanical first fix piping to walls
- Plastering Internal and External
-
-
-
-
- Doors installation and Dressing
- Tiling of Toilets, Kitchen and Rooms etc
- Plumbing Fittings in Toilets, Kitchens etc
25b. Construction of Inspection Chambers, Piping to Septic Tank
-
- Installation of Burglary Proof and Mosquito Nets
- Wardrobe and Kitchen Cabinets
-
- Fixing Electrical Fittings, ACs, Solar & CCTV
A. Substructure
-
-
-
- Rnft in column base and Starters
- Concrete in Col Bases and Footings
-
-
- Back fill and filling to level
9.Formwork to Slab, DPM and BRC
-
-
E. External works
- Fence works (completion, Plastering etc)
- Drainage Works (Exc, Slab, walls, plaster)
-
-
-
B. Superstructure
- Blockwork To Lintel Level
- Rnft and Formwork to lintel and Columns
- Concrete to Lintels and Columns
- Block work Levelling to Roof Level
C. Roofing
- Roof Beam Facia installation and reinft and formwork
- Concrete in Roof Facia and Beams
- Roof Carcass and Laying Roofing Tiles