Please enable JavaScript.
Coggle requires JavaScript to display documents.
๐ OMSC Ch6โ11 Mind Map (Integrated Layout) - Coggle Diagram
๐ OMSC Ch6โ11 Mind Map (Integrated Layout)
๐งญ Guiding Ideas (Big Picture)
๐ฏ Goal: deliver value (cost, quality, speed, flexibility)
๐ Think in flow: reduce waiting + smooth processes
๐ Use data: measure โ diagnose โ improve
๐ Continuous improvement: small changes, repeated
๐ง FLOW & PROCESS (Core Metrics + Diagnosis) โ Ch6
๐ Key measures
Flow time (T): time in system (wait + work)
Throughput rate (R): output per time
WIP (I): average items/customers in system
โญ Littleโs Law: I = R ร T
๐บ๏ธ Process understanding
Process map / flowchart
Service blueprint (frontstage vs backstage)
Value-added vs non-value-added time
๐ง Bottleneck focus
Bottleneck = step with lowest capacity
Symptoms: long queue before it, high utilization
Fixes
Add capacity at bottleneck
Reduce setup / interruptions
Move tasks off bottleneck
Standardize work
๐ LEAN SYSTEM (Remove Waste + Improve Flow) โ Ch7
๐ Lean principles
Value โ Value stream โ Flow โ Pull โ Perfection
๐๏ธ Common waste (simple list)
Waiting, defects, extra motion, overproduction, inventory
๐งฐ Lean tools
5S
Kanban (pull / WIP limit)
Setup reduction (faster changeovers)
Standard work
TPM (maintenance to avoid downtime)
โ Lean outcomes
Lower WIP + shorter lead time + more stable flow
โ ๏ธ Lean risk
Too lean can be fragile if demand/supply is unstable
โ QUALITY SYSTEM (Stability + Less Variation) โ Ch8โ9
๐ฏ What โqualityโ means
Meeting customer requirements consistently
๐ฐ Cost of quality (COQ)
Prevention + Appraisal
Internal failure (scrap/rework)
External failure (returns/warranty/reputation)
๐ Control (keep process stable)
SPC control charts
Variables vs attributes charts (basic idea)
Out-of-control signals โ investigate causes
๐ง Improvement (reduce root causes)
Pareto (focus on biggest problems)
Fishbone + 5 Whys (root cause)
๐ PDCA / DMAIC (Six Sigma)
โ Quality outcomes
Less variation โ less rework โ faster flow + better service
๐ PLANNING SYSTEM (Future Demand โ Resources) โ Ch10โ11
๐ฎ Forecasting (Ch10)
What to look for
Trend / seasonality / randomness
Methods
Moving average
Exponential smoothing
Causal (drivers)
๐ฏ Accuracy checks
MAD / MAPE
Bias (over vs under forecast)
๐ญ Capacity planning (Ch11)
Capacity terms
Design vs effective vs actual
Key decisions
Size / timing / location / technology
Options to match demand
Overtime / extra shifts
Temps / cross-training
Outsourcing
Inventory buffer (for stable demand)
Postponement (delay final customization)
โ๏ธ Trade-offs
High utilization โ more waiting
More capacity โ higher cost but better service
๐ CONNECTIONS (Draw lines between these nodes)
๐ฎ Forecasting โ ๐ญ Capacity (staffing, resources, planning)
โ Quality โ ๐ง Flow metrics (rework increases T and WIP)
๐ Lean โ ๐ง Flow metrics (pull reduces WIP, improves lead time)
๐บ๏ธ Process mapping โ ๐ Lean tools / โ Quality tools (find where to improve)