Start project mobilization - Coggle Diagram
Start project mobilization
Mobilization:site access, staging, E&S controls, utilities locate
Clearing and grubbing
Root/stump removal
yes
remove stump & root rakes
no
Shred/ mulch vegetation or stockpile
Install erosion & sediment controls (silt fence, inlet protection)
strip topsoil(if required) & stockpile separately
Survey & cut/fill stake control
Excavation
excavation test pits/ geotech confirmation
excavate to plan lines, benches & slopes
load trucks/ scrapers
QC: check elevations, slopes, water control
1 more item...
Pre-clearing surveys: tree protections, mark boundaries, cultural resources check