9/22~10/1 Callan Pre-ship - Coggle Diagram
9/22~10/1 Callan Pre-ship
Print Label
Swapping
OQC
DN/OBD/BOL
Pickup
If OQC block
Switch RSN
0 pressure
Step1
Step 2
Move 87, 88 from Peak back to Plano
Outbound Area
Move them to Outbound Area
MFG Perform Swapping & relabel (Stage2)
Finish
S2A, ship 9/25
S1A, Ship 9/25
S1B, Ship 9/26
S2A , ship 9/29
OQC/DN/BOL check on
S2B, ship 9/25
S1A, Ship 9/25
S1B, Ship 9/26
S2A, ship 9/29
Find 5 no grouping RSN
Step3
Normal Warhouse
Extend Gap between Group
79A
76B
68A/B
80A
81A/B
MFG perform swapping & relabel (Stage3)
Finish:
Final Group 76B Ship 9/26
Final Group 79A Ship 9/27
Final Group 80A, Ship 9/27
Final Group 81A, Ship 9/29
Final Group 81B, Ship 9/29
Move
Final 76B (After Swapping) Ship 9/26
Final 79A (After Swapping) Ship 9/26
Final 80A (After Swapping), Ship 9/27
Final 81A (After Swapping), Ship 9/29
Final 81B (After Swapping), Ship 9/29
1 more item...
Outbound Area
(Callan Production line)
Move
Final 79B (No need Swapping), ship 9/26
Final 80B (No need Swapping) ship 9/27
Final 73B (No need Swapping) ship 9/27
Final 75A (No need Swapping) ship 9/27
Final 75B (No need Swapping) ship 9/29
Step4
Normal Warehouse
Extend Gap between Group
71A/B
69A
72A
MFG perform swapping & relabel (Stage4)
Finish:
Final 72A, ship 9/26
Final 71A, ship 9/30
Final 71B Ship 10/1
1 more item...
Outbound Area
(Callan Production line)
Move
Final 77A (No need Swapping), ship 10/1
Final 77B (No need Swapping) ship 10/2
Final 78A (No need Swapping) ship 10/2
Final 78B (No need Swapping) ship 10/3
Move 68B to outbound
Separate 2 area
Normal Warehouse
(Original warehouse)
Extend the gap between Group
69B
72B
73A/B
76A
MFG perform swapping & relabel (Stage1)
Finish
Finish Final 69B
Final 72B ship 9/26
Final 73A ship 9/26
Final 73B ship 9/27
Final 76A ship 10/3
Move
Final 72B (After Swapping), ship 9/26
Final 73A (After Swapping), ship 9/26
Final 73B (After Swapping), ship 9/27
Final 76A (After Swapping), ship 10/3
OQC/DN/BOL check on
Final 74A (No need Swapping) ship 9/23
Final 74B (No need Swapping) ship 9/23
Final 82A (No need Swapping) ship 9/24
Final 82B (No need Swapping) ship 9/24
Final 72B (After Swapping), ship 9/26
Final 73A (After Swapping), ship 9/26
Final 73B (After Swapping), ship 9/27
Final 76A (After Swapping), ship 10/3
Outbound Area
(Callan Production line)
Move (Finished)
Final 74A (No need Swapping) ship 9/23
Final 74B (No need Swapping) ship 9/23
Final 82A (No need Swapping) ship 9/24
Final 82B (No need Swapping) ship 9/24
QWO