Pre-shutdown Tasks, On site works - Coggle Diagram
Pre-shutdown Tasks
Off site works
Steel structural Fab
Piping pre-fab
Foundation pre-casting
Off site works
On site works
Piping works
Piping Field welding
Manual valve erection
Piping Spool Erection & Fitup
Sub-contractor works
Bolt Torquing & Tensioning
NDT / PWHT
Civil Works
Concrete / paving re-instatement
Concrete / paving cutting
Excavation for Foundation
Cast in situ foundation
Pre-cast foundation installation / Backfilling
Steel structural works
Structual support erection
Piperack Strenghting
General works
Others
Scaffolding works
Material Shifting (with Hiab)
Rigging works (with Crane)