Lafrage Key Focus/Needs - Coggle Diagram
Lafrage Key Focus/Needs
Award of the Contract
SOW
Offer
SOW Attachments
Due Diligence other than Tekzone
Valve PO Placment
Interface P&ID
HAZOP
Lafrage go ahead
PO Placment
Technip Inputs Docs
Lafarge Inputs Doc
Offer/NDA/CBE/T&C/Lead Time
Technip Updated P&ID
Technip Shipment
Revised Techno commercial Offer from Technip
Legal Contract
Shipment Timeline
Inspection Report as requsted by Lafrage
Return Line Closeout
Drain Pump Procurement
Liq Shipment
FAT Punch Point Closeout
HAZOP Documentation
BOM and Loose Item Details
CV and Interview
Installation Manual/Isometric
Operation manual & As-Shipped Docs
MMRV
Instrumennt
MMRV Plan
Reporting Prootocols
Operation
JD From 44.01/NTE
Expected on- borading date
any Chcek-List /Daily Report
Maintanence Plan/Requirment
Opeartion Supervisor/JD/Onboarding
Communication Protocol
Inputs from Lafarge
HAZOP Inputs
Installation and Commissioing Contractor
Structure Design
Tank Procurment
Electrical SLD
Tie-in Execution
Branding
Name Plate
Container