Ethical Risk Identification
and Assessment
Project Risks
Overloaded Temporary
MCC Boards
Combined loads of 6MCC
Panels may exceed
board capacity
Equipment failure, Fire,
Forced Outages
Incorrect Cable
Rating or Length
Cable unable to
handle expected loads
Heat Build-up, Voltage Drops,
Safety Hazard
Temporary Boards not
tested before use
Testing skipped due
to tight schedule
Unsafe energising, Arc Flash
Unlabelled/Mislabelled
Cables
Mistakes in temporary
wiring Documentation
Cross connection,
energisation errors
Trip Hazards from cabling
Poor cable
routing/coverings
Physical Injury, Health and
Safety Non Compliance
Stakeholder Risks
Co-ordination Breakdown
with Contractors
Inconsistent access or
Unclear Responsabilities
Missed steps,
unsafe work practices
Inadequate Stakeholder
buy in
Staff not consulted
or informed of risks
Resistance to plan,
lower morale
Disruption to production Team
Unclear Switch
over Schedule
Loss of productivity
Late Approval for Works
Delayed sign off from
management or safety officer
Compressed timelines,
rushed execution
Ethical Risks
Non-transparent reporting
of near-misses
Incidents or shortcuts not
documented truthfully
Repeated Risks, Failure to
learn/improve
Environmental harm from
waste handling
Disposal of temporary cables
not managed responsibly
Pollution,
Regulatory fines
Worker Safety Compromised
under pressure
Urgency to meet deadlines may
lead to skipping checks
Injury, reputational
harm, negligence
Low Quality components
sourced to cut costs
Pressure to meet budget may
override safety standards
System failure, breach of
ethical Procurement