Please enable JavaScript.
Coggle requires JavaScript to display documents.
Home Construction - Coggle Diagram
Home Construction
To do
Ask for documentation to review
Avoid unexpected costs or delays
What are provisional sums or varoable costs
detail list of inclusions and exclusions
Should this be reviewed by the solicitor
Take a book to note down
Take a copy to review the tender
Power & Lighting
How many and locations
Inside and outside
external lights
can the number changed after a review
Data TV and NBN
EV charging?
Costs
Base price
Inclusions and exclusions
Site costs
Excavation
Retaining wall
Hydrolic pump
Unknowns
Variations / Upgrades
Kitchen
Lighting
Flooring
Permissions
Who is going to take approvals
Who is going to bare the costs
Inclusions
Brands to be considered
Area wise
Kitchen
Cabinetry
Soft close doors and drawers included in the standard offering
Over head cabinets included / height?
Pantry cupboards ?
Extra drawers
Type of cabinatry
Benchtops
material
Size
Edge
Round or square
Waterfall edge ?
Appliances
Brand model and size
Free standing or built
Ducted or recicultaing
Microwave, dishwasher included or not ?
Fridge plumbing included?
Splashback
Sink and tapware
Sink type
Double bowl ?
Stainless steel
Tap type
Mix or pull out