Please enable JavaScript.
Coggle requires JavaScript to display documents.
M/V Bridge - Coggle Diagram
M/V Bridge
Operation aspects
IT System integration and Server installation & PC if needed
Water treatment system installation
Greenlog
CSM installation
Camera monitoring system
IHM maintenance
Paint company name or not
T/C health check
List of oil grade used
Request critical spare parts for DGs
Last overhaul report for ME^ AEs
Insurance
Stamp UME
Providion RFQ and related matters
Vessel's email
Lashing equipment
Vessel chart update
Engine log book & ORB RFQ
Cigarrette
Medical store
Welding machine and associated tools
PPE
Scaler machine
Lube oil RFQ
Consumable RFQ
Chemical RFQ & list of chemical used
Mooring rope RFQ
Stationary and Paint RFQ
phone cells
Vessel to check
Drencher test including nozzle and pipe condition
CHeck ballast and heeling control panel
ME special tools
IHM manual
Any oversize bearing on ME & AE ?
List of gas bottles onboard
DCS untill delivery date