PRODUCTION DECREASE BLOCK 2-05
POWER GENERATION CAUSES
Essungo Platform
Bagre Platform with S 20 over 3.000 hours w/ maintenance
Lombo East Generator ( Back up/ Lack up of Batteries)
D1-11 Power Generation
WELL PERFORMANCE CAUSES/ANALYSIS
Daily Well Test unavailability
Reservoir Engineering Studies
Production Decline Analysis
Flash Production from some Fields
Well equipment failures SSCV
Formation of Hydrates due lack of proper gas lift
Well Intervention Studies
PREVENTIVE EQUIPMENT MAINTENANCE
PM Planning
PM Execution
MAINTENANCE ORGANIZATION
Spare Parts
Bagre Gas Lift Compressor
Reservoir Engineering
Gas Injection from Block 17
BLOCK 2-05 PRODUCTION DECREASE