Please enable JavaScript.
Coggle requires JavaScript to display documents.
LNG Terminal Tugs - Coggle Diagram
LNG Terminal Tugs
Other Requirements
Gas detection alarm
Gas sensors
Explosion-proof motors
Main engines with rigsaver (stop system if gas is sucked)
Spark arresters in exhaust
Remotely operated ventilation dampers
FiFi 1 or above with water spray
Fendering with water lub Low contact pressure < 14t/m²
Anti-spark fendering
Electrical EQP certified for LNG zone
Intrinsically safe electrical points
Anti-static synthetic towlines
Additional FiFi requirements
Extra Requirements
Seaworthy
BP for wind and waves
Powerful escort towing winch with quick response render-recovery
Escort capabilities
Requirements in the 80 and 85t ASD
Australia
Double Hull
LNG alarms
Remote closing fire flaps
Pressurized accomodation
Dynamic escort winch
Side pocket ladder
Pilot transfer capability
Diesel-electric propulsion
Non-hydraulic deck EQP
Surface finished with low-sheen silicon paint
Low-spilling sodium deck
Doubled-walled fuel tank
Solar panel for water heating
Water recycling from ARCOND
Battery pack for electric driving
Wind turbine for loading batteries