Please enable JavaScript.
Coggle requires JavaScript to display documents.
Assembly Process - Coggle Diagram
Assembly Process
- Pre-Build Control Process
- Inspect chassis for damage
- Label OEM packging with inspection label (if applicable)
- Return OEM packaging to warehouse
- Ensure all components descriptions match MO
- Ensure all component lot numbers match MO
- Inspect components for damage
- Ensure correct PDI has been printed
- Read through PDI for changes
- Ensure PDI has correct MO
- Ensure serial number label sheet is present
- Ensure serial number matches MO
- Affix serial number label to PDI
- Confirm all parts present
- Ensure build area is clean and tidy
- Place chassis on piece of foam
- Ensure I/O gaskets are fully clipped in and all ports are clear
- Ensure all screws are present and secure
- Ensure CPU has adequate cooling paste applied
- Ensure components are fully seated and secure
- Ensure all cabling is tidy and consistent
- Ensure all zip ties are tight and excess is removed
- Ensure all power cables are connected and secure
- Post Assembly Check/Control
- Ensure all components are correct
- Ensure all installed components are consumed
-
- Visually inspect unit for mistakes
-
- Review PDI to ensure it has been completed
-