06FM201 BINDER MASS FLOWMETER
2017
2022
2023
2024
2025
2 JANUARY
Event: Clean-up cement from Rotary Valve going to FE202 (found hard and build-up cement around FM201 housing.
Time: Day Shift
13 JANUARY
Event: Electrical Team to inspect the speed target of FM201.
Time: Night Shift
5 & 6 JANUARY
Event: Installation of FM201, and electrical wiring connection and testing
Time: Day Shift and Night Shift
7 JANUARY
Event: Assisted Electrical to test run FM201 Binder Mas Flowmeter
Time: Night Shift
18 JANUARY
Event: Inspection of HP201 and FM201 - no blockages found, both equipment clean and no traces of build-up. Calibration of FM201 due to not achieve the setpoint of binder delivery, setpoint is 20tph but the present value 14tph only.
Time: 0609H - 1010H
Downtime (minutes): 241.2
19 JANUARY
Event: Binder Mass Flowmeter MCC fault, burnt smell coming from the equipment.
Time: 0943H - 1158H
Downtime (minutes): 135
22 MARCH
Event: Electrical Team conducted troubleshooting of Binder mas Flowmeter FM201 Motor.
Time:1705H - 2242H
Downtime (minutes): 336.28
08 APRIL
Event: FM201 - troubleshooting of binder system issues not reaching required amount of cement at 12%
Time: 1103H - 1214H
Downtime (minutes): 70.95
14 JULY
Event: Testing of FM201
Time: 1030H - 1136H
Downtime (minutes): 65
29 AUGUST
Event: Assisted Mechanical Team for the replacement of Binder Mass Flowmeter
Time: Day Shift
14 JANUARY
Event: Inspection and cleaning of cement build-up at Binder Mass Flowmeter
Time: Day Shift
22 February & 2 APRIL
Event: Inspection and cleaning of Binder Mass Flowmeter
Time: Day Shift and Night Shift
18 APRIL, 27 MAY & 4 JUNE
event: Inspection and cleaning of binder mass flowmeter. Removed small piece of rubber which blocked two compartments of FM201 discharge
Time: Day Shift
12 SEPTEMBER
Event: Calibration of FM201 and pull-out / reinstallation of FM201 spool
Time: Day Shift
5 NOVEMBER
Event: Binder mass Flowmeter low flow
Time: 2155H - 2246H
Downtime (minutes): 51
26 NOVEMBER
Event: RV201 - unblocking of clogged up Binder Rotary Valve
Time: 2350H - 0259H
Downtime (minutes): 195
1 DECEMBER
Event: Electrical to bypass the FM201 Binder Mass Flowmeter due to stuck-up Motor. Stop paste filling due to leaking Binder Mass Flowmeter housing.
Time: 1700H - 2000H, 2018H - 2338H
Downtime (minutes): 379.8
13 DCEMBER
Event: Electrical to by-pass the FM201 Binder Mass Flowmeter due to stuck-up Motor
Time: Day Shift
15 JANUARY
Event: FM201 tripped, Electrical decided to replace the soft starter.
Time: 1220H - 1700H
Downtime (minutes): 268.95
15 JANUARY
Event: FM201 communication fault
Time: 1202H - 1351H
Downtime (minutes): 103.95
27 MARCH
Event: Stop the Paste fill to give way to Electrical Team to rectify the issue at FM201
Time: 1325H - 1543H
Downtime (minutes): 183.88
22 DECEMBER
Event: Repair FM201 Binder Mass Flow Meter
Time: 1458H - 1830H
Downtime (minutes): 211.05
6 JANUARY
Event: Stop and start of binder mass flowmeter and no reading but in actual there was a discharge. Opened FM201 but no blockage
Time: 1100H - 1158H
Downtime (minutes): 58
14 JANUARY
Event: FM201 tripping numerous times without alarm reflected on the SCADA. Initial findings by Electrical was that there was loose connection in the power supply. To be rectified during shutdown.
Time: 1520H - 1602H
Downtime (minutes): 42
18 JANUARY
event: FM201 frequent tripping making the paste sequence faulted. Stopped filling to give way for Electrical Team to rectify issue.
Time: 1030H - 1300H
Downtime (minutes): 150
26 & 28 JANUARY
Event: Checking and assistance to Electrical personnel for the rectification of FM201
Time: Day Shift
10 & 18 APRIL
Event: Inspection and cleaning of binder mass flowmeter to make sure that there are no chunk of cement blocking
Time: Day Shift and Night Shift
18 MAY, 21 JUNE & 7 JULY
Event: Inspection and cleaning of binder mass flowmeter, removed chunks of cement and piece of steel.
Time: Day Shift and Night Shift
4 & 30 SEPTEMBER, 17 OCTOBER, 5, 13 & 26 NOVEMBER, 20 DECEMBER
Event: Inspection and cleaning of binder mass flowmeter
Time: Day Shift and Night Shift
04 MARCH
Event: 06FM201 tripped due to high input volt
Time: 1447H - 1458H
Downtime (minutes): 11
17 JULY
Event: Under dosage of cement, removed cement chunks from FM201
Time: 0502H - 0539H
Downtime (minutes): 35.11
03 SEPTEMBER
Event: Pressure switch low alarm of FM201
Time: 1849H - 1911H
Downtime (minutes): 22.38
05 DECEMBER
Event: Communication fault, inspection and cleaning of FM201
Time: 1459H - 1541H
Downtime: 82.10
16 JULY
Event: Opened FM201 inspection hatch and removed accumulated cement chunks
Time: Night Shift
03 & 10 AUGUST
Event: Inspection of and cleaning of FM201
Time: Day Shift
29 AUGUST
Event: Inspection of FM201 and removed small cement chunk
Time: Day
05 SEPTEMBER
Event: Inspection and cleaning of binder mass flowmeter
Time: Day Shift
26 SEPTEMBER
Event: Immediately stop paste filling upon confirmation that there's no cement being dosed with basis coming from SCADA reading, from panel of FM201 and from actual inspection at field. Day shift crew to continue fault finding on the issue of FM201/ Rotary valve
Time: Night Shift
27 SEPTEMBER
Event: FM201 rectification on no reading (comms) issue
Time: 1700H - 2220H
Downtime (minutes): 320
12 & 17 OCTOBER
Event: inspection and clean up of FM201
Time: Day and Night Shift
15 NOVEMBER
Event: Stopped paste filling due to blocked FM201. Frequent tripping of FM201 due to loss comms alarm.
Event: Installation of Binder Mass Flowmeter