Expected result
Positive
:!: When a person weighing up to 100 kg enters the elevator and presses the button of a certain floor
:check: Then the elevator sends this person to the specified floor in a maximum of 20 seconds
Negative
:!: When 10 people weighing less than 100 kg enter the elevator at the same time and travel in a cycle until everyone enters and exits. :check: Then the elevator will continue to work in standard mode
Execution
Manual
:!: When a person enters the elevator, they can press the button of the desired floor :check: and the elevator will send them there.
Automated
:!: When a person has a special access card, the data of which is stored in the elevator system of a certain entrance. :check: Then by scanning this card, the elevator can automatically send a person to the needed floor without manual control by a person (that is, when a person himself presses the button of the needed floor)
Level
Component/Unit
:!: When an elevator user has an unpleasant situation in the elevator :check: he can refer to the elevator information base and get the CCTV footage to capture a certain moment in the elevator.
Integration
:!: The elevator system is synchronized with other building systems in order of emergency situations, :check: for example, fire, the elevator alarm and security system is activating in the same way as in other parts of the building.
System
:!: When, when the lights in the building are turned off, the elevator runs on a generator and the elevator is used in careful (economy mode), :check: it will work longer by 5 hours.
Acceptance
Alpha
:!: Elevator board can be tesred in the workshop, :check: where the elevator is assembled under conditions of elevated temperature for 16 hours, :check: and also with the help of an elevator simulation stand, when the elevator board is connected to an imaginary elevator and forced to work continuously for 4 hours
Beta
:!: After testing the elevator board in the shop, :check: lift can be continued testing physically in the building, where the elevator will be installed
Run Object
Static
Review
:!: When one engineer tests the reliability of elevator ropes and reports the results to another engineer, :check: he is convinced that the ropes are suitable for the parameters of the elevator, that being designed
Software analysis
:!: Elevator board can be tesred in the workshop, :check: where the elevator is assembled under conditions of elevated temperature for 16 hours, :check: and also with the help of an elevator simulation stand, when the elevator board is connected to an imaginary elevator and forced to work continuously for 4 hours. :check: After that, the test gives a result on the reliability of the elevator (10 is the most reliable, 1 is the least reliable)
Inspection
:!: When the elevator scheme is finished, it will be obtained by the elevator inspection commission, :check: which will check whether this elevator falls under the EN81-70 elevator compliance standard
Dynamic
:!: During traffic in a 15-story building, :check: the elevator can work continuously, using 200 kilowatts of energy per hour.
Code Access
White-box
:!: If a visually impaired person enters the elevator (which the system will understand from the information on the access card, in which this data was previously entered), :check: then the voice notification system will be activated in the elevator
Black-box
:!: If one of the four fiber metal ropes of the elevator is cut, :check: the safety system will work and the elevator will stop immediately
Formal
Exploratory
:!: When replacing the elevator with a new one, :check: the board of this elevator is first tested with the help of an elevator simulation stand, when the elevator board is connected to an imaginary elevator and forced to work continuously for 4 hours and then in a 15-story building
Experience
:!: If one of the four fiber metal ropes of the usual elevator in 15-storey house, designed for 1000 kg is cut, :check: the safety system will work and the elevator will stop immediately
Test-based
:!: When the elevator is submitted for a technical inspection, :check: the mechanic checks the operability of the elevator according to the norms and parameters provided by the legislation
Related to changes
Regretion
:!: When the elevator rope is damaged, :check: then check that the new roller, which scrolls the elevator rope, and the user can go up to any floor from 15
Retesting
:!: When the elevator cable is damaged, :check: check that the new roller that rotates the elevator cable to move up and down is working
Sanity
:!:When the elevator cable is damaged, :check: check that the user can climb to any floor from 15 and the elevator moves according to the floor selected by the user
Smoke
:!: When the electricity in the building is turned off, :check: the elevator goes into energy saving mode and can work in normal mode, but the floor announcement function is turned off in this case
Types
Non-functional
Performance
Stress
:!: While the elevator is able to withstand the weight of eight hundred kilograms, :check: people transport a thousand kilograms in it
Benchmark
:!:During a blackout, people use the elevator for 10 hours continuously :check: to understand how long it lasts
Load
:!: When an elevator was installed in the entrance, which is capable of working every day in a 15-story building, :check: people use it
Reliability
:!: When users are guaranteed that the elevator can run for 8 hours on the generator, :check: they use it for 8 hours
Usability
:!: When people want to purchase a means of moving between floors faster and more efficiently, :check: they choose an elevator that is the right size for their building structures.
Compatibility
:!:When the master replaces the old elevator buttons with new ones, :check: it does not affect the functionality
Installation
:!: When the parts of the elevator arrive at the workshop, :check: they are assembled, and then this structure is installed in the building in which it will work
Concurrurent access
:!: When a fire alarm is activated in a building, :check: the safety systems of the elevator and the building are synchronized
Security
:!:When a screen is built into the wall, :check: it shows which floor the elevator is currently on
Functional
:!:When the elevator operates in normal daily mode, :check: then it can move in a 15-story building at a speed of 8 meters per second, while carrying 800 kilograms
-