Decontamination Master Plan
Product Type
Primary degradation products
Cleanliness Level to achieve
Specific risk factors
Laboratory method testing and results
Refer to Compliance Standards
Sampling locations
Worse case situations
Sampling twice for increase in recovery
Sampling bias issues
Levels of acceptable cleanliness
Recovery
Hypersensitivity Data
Intensive sampling
Reproducible results
Detection levels
Swab sampling preferences
Recovery
UHPLC Mass Spec
TOC
Other methods
Permissible acceptance criterion
(RAPPEM) Risk Assessments Pre & Post Event Management
Overall risk analysis
Possible Events
WHI analysis
Post Event control
Prevention measures
Compliance standard
Who does the checks for compliance?
Bias criteria
Safety criterion
Operatives
Workplace and site impact
Environment
Known contaminant risks
Standard of protection
Worst areas of contamination
Emergency plans
Safe Access/Egress
Process of decontamination
Dry Gassing
Manual cleaning
Mechanical cleaning
Systems Dismantling for access
Utility systems
HVAC
Extract/Supply/Dust Collection Systems
Void access
Building Surfaces & Fabric
Fogging
PPE/RPE
Suitability
Comfort
Durability
Level of protection
Operative Monitoring
Air sampling
Change procedures requirement
Cross contamination issues
Sealing off areas
Three stage principles
Wrapping
Procedures for control
Transition areas & control
Negative pressure control
Building integrity
Removal & Disposal from site
Equipment/Waste
Building/Site
Full Containment/Partial Containment
Removal and disposal of equipment
Decontamination Method
Risk factors
Suitability
Effectiveness
Waste streams disposal & recycling routes
Hazardous waste disposal routes
Principal contractor?
What cannot be decontaminated
Waste minimisation/recycling cost reduction
Control and auditing
Production equipment disposal
Decontamination sequence
Product contact surfaces
Worst to best/highest to lowest principle
Decon process flow for efficiency
Identification of decon areas
Traceability process
Bar coding
QR coding
Pilot Study in area to prove process
Method development
Process Test area
Process efficiency
Efficiency handling decontamination equipment
Adjustment for results efficiency
Final report and handing over for demolition
Content
Project planning and control
Project costs
Milestones
Staged payments
Progress and adjustments
Measuring progress
Project Software
Project goals
Equipment required
Types