Please enable JavaScript.
Coggle requires JavaScript to display documents.
Lesson 5 - Coggle Diagram
Lesson 5
Automatic Train Control(ATC)
Function: Monitoring the train speed and apply speed limit
Function: Activated the emergency brake when necessary
Function: Prevent the train from crashing, speeding and unknown movement
Working Relationship: ATC with ATP to apply the speed limit and provide safe braking
Main Role: Be certain of the safe train operation by monitoring and controlling the train movement
Automatic Train Operation(ATO)
Function: Be certain of the exact stopping at the station
Function: Manage the opening and closing of train doors
Function: To Control the train speed
Working Relationship: ATO with ATP to maintain the safe speed and stop on the exact station
Main Role: Handle the train driving function
Automatic Train Supervision(ATS)
Function: Provide route and track the train movement
Function: Solve the problems between trains
Main Role: Control the management and the main train network
Working Relationship: ATS with ATC, ATO and ATP to maintain the train system
Automatic Train Protection(ATP)
Function: Activate the brakes if the speed is higher than the limit
Working Relationship: ATP with ATC and ATO to apply speed restriction
Function: Viewed the train speed
Main Role: Be certain of safety braking and protect against speeding