Please enable JavaScript.
Coggle requires JavaScript to display documents.
POW creation of multi-story building, Clearing and Grubbing, for items na…
POW creation of multi-story building
Database Idea
Clearing and Grubbing
Structural Excavation
RSB
Structural Concrete
Embankment (From Structure Excavation)
Formworks and False Works
Soil Poisoning
for items na connected
Embankment (From Borrow)
Gravel Fill
Catch Basin
Septic Tank
Sewer Line Works
Storm Drainage and Downspout
Plumbing Works
Ceiling
Steel Casement Window
Doors
Waterproofing
Tiles
Tactiles
Cement Plaster Finish
Cement Floor Finish
CHB 100 mm
Railings
Painting Works
Electrical Works
Demolition
CHB 150 mm
Structural Steel