Environmental Factors
Assumption made that as main board was isolated and so was the circuit breaker
:
Red traffolyte label missing to show correct isolation points
Fault finding relies on experience and system failure to identify .E.g., circuit breaker was running from a separate isolation point
Human Error Interaction
-
Less than adequate attention by trade-person electrician to ensure the third year electrician has tested for dead on circuit breaker when isolation point 1 was isolated for main board.
-
Inspection
-
-
-
Inspection of MCC post incidents identified the electrical power supply for circuit breaker was isolated outside MCC main building.
Management
Contractors identified circuit breaker replacement to greater capacity requirements (AMMANN & A.C.E.S)
-
-
-
-
Systems
Schematic developed and was current but not reviewed at time of job task 2024
-
Main board and circuit breaker isolation point should be isolated from isolation point outside of MCC
-
-
Maintenance
Electrical Schematic developed for commissioning 2011
Electrical system to the Gladstone Asphalt Plant upgraded/ retro fitted for the new digital display (voltmeter) and new interface(temperature and tracking for Brisbane Lab team).
-
Method / Process
Less than adequate pre -task briefing concerning the task with key stake holders (AMMANN & A.C.E.S )
Less than adequate SWMS review of critical steps at beginning of task/job. For example , debriefing concerning isolation points and job steps
-
Supervision
-
-
Failed to check electrical equipment (test for dead) prior to completing replacements of circuit breaker.
-
-