Engineering Closure, Jacobs Model Changes, Corrosion Report, Impacted by…
Engineering Closure
Procedures - Albert
Shipping and handling
Spare Parts
Preventative Maintenance
Alkaline Procedure
Steam Blow Procedure
Acoustical Procedure
Bakeout/Boil out Procedure
O&M Table of Contents
Insulation Design Spec
Electrical Documents
Loop Drawings
RPU Drawing
Panel List
SLD
LCS/LVS Drawing
CCO-008
Cable Schedule
Instrument Cable
Electrical Cable
CO-008
Interconnecting Wiring diagram
IO List
BOP - Emad
Cable Tray
3D Model
Piping
Supports
Impacted by CCO-08
Calculations - Norda
Drawings - Norda
Isometrics
Drawings Norda
Piping Calculations
Impacted by CCO-08
Facility Arrangement
Electrical Facility Arrangement
Instrument Location Drawing
Anchors Bolts
R/L Ducts
SRC
Non R/L Ducts
SRC
P&ID Finalization
List
Manual Valve
Instrument
Speciality
Automated Valves
Equipment
IO List
Vendor Finalization
De-superheater
Caustic dosing Pumps
Existing Vendor Package Finalization
PCN
FAT Procedures
SAT Procedures
PFD - Dana
Jacobs Model Changes
Relocation of Electrical Panels
Additional Columns
Corrosion Report
Impacted by CCO-008
Impacted by CCO-008
Impacted by CCO-008
Impacted by Bypass Duct RFI
CCR - XXX Fuel Train
SPC Support changes
CCR - Piping Suports
CCR Out of Scope Line List
CCR Air Receiver
No CCR will be issued, No official comment provided
Flow Confirmation
Vendor P&ID Markups
Client Approval on Sigma X pump
Norda Markups on Steam Design
WHB Supports
Impacted by CCO-008