Chapter 16: Control
Teams build monitors that let them ensure process continues to work successfully after changes
Revise FMEA
Teams use FMEA to identify any failures in process and causes of those failures
Reasons for visiting FMEA: team can see positive and significant changes occured by solutions, and team can idenitfy next problem or root cause
Create a Control Plan
Teams should create a written control plan for process owner to help owner and team track and respond to KPIs so process remains improved
Control plans can be spreadsheets, digital docs, or hard copy docs
Control plans include: company/ dept name, name of person who create plan, data plan was created, name of person who last edited plan, date plan was last edited, project/ process name, process owner, list of process steps where control action is required, CTQs associated with each action, limit specifications, unit of measurement, method of measurement, sample size, frequency of measurement, person responsible for measurement, where information is recorded, correction actions, and associated policy and procedure documents
Visual Management
Help business teams maintain controlled process, can implement signs, posted matrixes and instructions, auditing boards, color coding, safety signals
SPC Charts
Control chart elements: Line chart of data with plot points for specific data points, x-bar line representing average of data points, lines above and below x-bar line representing 1,2, and 3 standard deviations from median in either direction, upper control limit line 3 sd above media, lower control limit line 3 sd below median
8 Tests for control chart
Test 1: single point on control chart appears outside of ucl and lcl, can cause major problem
Test 2: 9 points in a row appear on one side of center line, change occured in process
Test 3: 6 points on control chart increase or decrease in row, process is becoming less or more efficient
Test 4: 14 points on control chart in a row alternate moving up and down, variation in machines, employees etc.
Test 5: 2/3 points in a row on control chart are in upper a or lower a section, special cause causing high variation
Test 6: 4/5 points in a row on control chart are in upper b section or lower b section, problem of major causation or shift
Test 7: 15 points in a row are located within C section above or below center line, control limits are no longer relevant to process
Test 8: 8 points in a row are on control chart located on either side of center line but none are located in c section above or below line, issue of mixed resources or processes
Teams Celebration and Reflection: teams that made improvements that are in control and capable can celebrate and reflect on outcome of project with sponsor, and can bring up ideas for future projects
Control Tollgate Checklist
Team calculated performance and capability of new process
Team has written control plan and communicated it to process owner
Team has created monitor for process
Team has provided process owner with all tools and information required to maintain improvements
Sponsor or champion has been informed of improvements
Team met to reflect on project and generate ideas for future