construction phase
ground - earth work
road base
anti termite
compaction testing
compaction and depth test
soil leveling and compaction
marking of axes and inspection by consultant
excavation
mep works 1st fix
w/c part
a/c ducting work
plumbing
manhole works for sewer and services
conduting works
mep 2est fix
finishing work
gypsum work
tiling work
wall tiling
floor tiling
door and windows and glass work
procedures
priliminaries
procurements
structure work
sub structure work
pcc for plinth beam in the middle portion
reinforcing for the tie beam
back filling 1st phase
shuttering of tie beam
bitumen paint
inspection and concrete
solid block work
deshuttering
neck columns shuttering and pouring
bitumen paint
concrete pouring
back filling 2end phase
raising inspections
preparing for ground slab / grade slab
placing of reinforcement
mep conduits and provisions
shuttering footing box
anti termitemite
deshuttering of pcc
inspection and concrete pouring for the grade slab
placing of pcc boxes
super structure work
1st floor work
slab scaffolding
staircase shuttering
drop beam base shuttering
slab shuttering
inspection and concrete
reinforcment work
shuttering work
mep conduits and provisions
column reinforcement
inspection and concrete
steps will repeat for 2nd floor work
parapet wall
header room
dusty work
block works
manhole works for sewer and services
water proofing works
final inspection by authority for the bcc