Unit 3 Summary
Production processing
The pre-numbered raw materials issues slip (RMI) is a request for the issue of raw materials required for a particular production run
All raw materials issued to production should be listed on the daily production report and a copy sent to the raw materials stores staff to compare with the raw material inventory master file records for that day
At the end of each day, the total time recorded on job cards should be reconciled to the total hours worked by production staff. Any differences should be accounted for
The shift foreman or production manager should be assigned the responsibility of inspecting that each stage of the production process has been properly completed, before the goods pass to the next stage. This authorisation should be done via a signature on the relevant on the job card
Once the production process is complete, a quality control inspection should be performed to detect any apparent defects before the produced goods are transferred to the finished goods store
The raw materials, labour and machine hours worked, as well as overhead allocations on the completed job card should be inspected by the production manager to ensure all production charges are correctly recorded
Any differences or variances from standard costs, and any unexpected items such as labour overruns, should be duly authorized by the production manager, before the goods are physically transferred to and accepted by the finished goods inventory stores staff
The factory or production manager should authorize, by signature, the transfer of the manufactured goods to inventory. Acceptance of the goods into finished inventory should be acknowledged by signing the completed production report by the finished goods inventory stores staff
-
-
-
-