Please enable JavaScript.
Coggle requires JavaScript to display documents.
Chapter 1: - Coggle Diagram
Chapter 1:
-
-
-
Silos
-
Category
Horizontal Silos
-
Reflects the breaking of complex tasks into smaller manageable tasks that could be assigned to a group of people
Functional Silos
Teams of employees, grouped by function, that all operate separately from each other, without cross-collaboration.
Vertical Silos
Organizations also divided roles in hierarchical layers from strategic planning to management control and operation control
Common data format
Integration method to avoid every adapter having to convert data to/from every other application’s format
-
-
-
-
Implementation
-
Application software is installed, users are prepared and trained, data files are converted, and the application systems and procedures are made operational
System Integration
Allow a heterogeneous Information System (IS) to communicate and share information seamlessly with one another
-
Enterprise Architectures
Consist of many systems and applications, which provide the various services to company
SYSTEMS PLANNING
Develop the long-range systems plan for the implementation of an integrated, automated environment within an organization
ARCHITECTURE DEFINITION
Confirm and refine the high-level conceptual solution identified during the systems planning phase into an optimum solution to the problem
ANALYSIS
Specify the proposed solution in detail. This involves further refining the requirements from the Architecture Definition phase
-
FACILITIES ENGINEERING
Create the physical environment including construction of data centers and installation of hardware, and to document this for future reference
-