SPIKE X Challanges
Surface Design Finalisation
Sustained Flow Rate
Pressure Requirement
Electrical System
Total Load/Grid, BDG, Solar PV
Iso Tanker vs Vertical Tank
Power for Project
Grid-500KW
Bio-Diesel
Off Grid Solar + Battery
On Grid Solar + Battery
Well Construction/Completion
can we use SPIKE 1 well for Injection (Pros & Cons)
Different Scenario
Recommended Item
Instruments Needed for MMRV
Ask for the Detailed MMRV plan and Data recording
Is PLC Required?
Hiring Instrumentation Engineer
Budget
List Long Lead Items and Cost and Seek Approval
Opex Cost-No profits-how long we should be running
Air Capture Location and Scheme
Get the Confimration from Air Capture asap
Get the Power Quotation
Construction Contractor
SOW and Floating to the market
Warehouse Location
Operator Recruitment
Can we use Ridge Resource
Hiring Plan
Design Review and HAZOP
Local Support