Please enable JavaScript.
Coggle requires JavaScript to display documents.
singapore airworthiness requirement(SAR) - Coggle Diagram
singapore airworthiness requirement(SAR)
sar part 21
part A
general
applicability and definations
exemptions
part B
eligibility
types certificates data sheet
changes to type certificates
part D
eligibility
production limitations
inspection system
quality system
part I
general requirements
special conditions
equivalent safety findings
national aviation authority requrements
additional requirements
technical documentation
continued surveillance
reporting and recordkeeping
mandotory incident reporting
recordkeeping requirements
airworthiness requirements
certification process
design approval
type of certificates
compliance with design standards
engineering data and analysis
flight tets reports
system and equipment design
supplemental type certification
modifications and alteration
testing and documentation
compliance with additional standards
production approval
production certification
quality system
quality assurance manual
inspection proceedures
supplier control
production planning
serial number control
configuration manaement
manufacturing process
design criteria
performance standardds
powerplant performance
aerodynamic performance
environmental standards
noise emission
emission of gaseous pollutants
safety standards
crashworthiness
fire protection
system safety assesment
compliance document
certification basis
applicable regulations and standards
special conditions
compliance checklist
detailed requirements verification
documentation cross-reference
test reports
plans and procedures
data and analysis
continuing airwothiness
maintenance documentation
instructions for continued airworthiness
repair and alteration procedures
airworthiness directives
compliance procedures
reportinmg requirements
service bulletins
notification and compliance
continued compliance verification
part 66
SAR PART 66
CAT C
permits the holder to issue certificates of release to service following base maintenance on aircraft
CAT A
permits the holder to issue certificates of release to service following minor scheduled line maintenance and completion of simple tasks in line and base maintenance
satisfactory completion of CAT A
type of training in SAR Part 145
SAR part 147
CAT B
B1
permits the holder to issue certificates of release to service and to act as B1 support staff following ,maintenance of the aircraft structure, powerplant, mechanical and electrical system
B2
maintenance of avionics and electrical systems; and performance of electrical and avionics task within powerplant and mechanical systems, requiring only simple test to prove serviceability
continuity of license
continued licence to be applied before expiry date, grated no disability is present
knowledge requirement
demonstrate proper knowlege of appropriate subjects through(examinations)
A pass of all subjects and modules is needed to be sustained for at least 10 years
SAR part 145
KEY Elements
Technical Data: Establishing procedures to control and verify the use of approved technical data for maintenance tasks.
Facility: Ensuring an adequate facility, tools, and equipment for maintenance activities.
Records and Documentation: Maintaining accurate records of all maintenance actions and related documentation for audit and regulatory purposes.
Inspection and Testing: Prescribing procedures for adequate inspection, testing, and releasing of aircraft and components after maintenance.
Safety Management System: Implementing a Safety Management System (SMS) to identify, assess, and control safety risks associated with maintenance activities.
Qualified Personnel: Employing and training technicians and inspectors to perform maintenance tasks and certify airworthiness.
Applicability
Applies to organizations seeking to obtain or maintain a Part 145 approval certificate from the regulatory authority (e.g., FAA in the US, EASA in Europe).
Scope
Covers the requirements for the maintenance of aircraft, aircraft components, and equipment by organizations involved in the maintenance, repair, and overhaul (MRO) activities.
Part 147 (Approval of Maintenance Training Organizations
SECTION 1
SUB PART A
GENERAL
EFFECTIVITY
DEFINITIONS
APPLICABILITY
APPLICATION AND ISSUE
SUB PART B
FACILITIY REQUIREMENT
PERSONNEL REQUIREMENT
RECORDS OF INSTRUCTOR,EXAMINERS AND ASSESORS
INSTRUCTIONAL EQUIPMENT
APPLICATION AND ISSUE
MAINTENANCE TRAINING MATERIAL
RECORDS
TRAINING PROCEDURES AND INTERNAL QUALITY ASSURANCE SYSTEM
SUB PART C
THE APPROVED BASIC TRAINING COURSE
BASIC KNOWLEDGE EXAMINATINO
BASIC PRACTICAL ASSSESSMENT
SUB PART D
AIRCRAFT TYPE/TASK TRAINING
AIRCRAFT TYPE EXAMINATIONS AND TASK ASSESSSMENTS
SECTION 2 AMC/IEM
SAR 39
SAR-39 Overview
Effectivity Timeline
Initial issuance and effective date (15 Nov 2003)
Amendment 1 (15 Dec 2006)
Amendment 2 (8 Aug 2017)
General Requirements
Prescribes requirements for Airworthiness Directives
Definitions
Airworthiness Directive
Foreign Airworthiness Directive
Compliance Requirements
Singapore Aircraft
Compliance with SAR-39.10-issued Airworthiness Directives
Alternative means of compliance
Alternative means of compliance
Compliance with relevant authority's directives
Alternative means of compliance
Authority's precedence over foreign directives
Notification of compliance results to the Authority
Issuance Process
Conditions for Issuing an Airworthiness Directive
Unsafe conditions in aircraft or component
Likelihood of the condition in other aircraft or components
Alternative Compliance Approval
Application Process
--Required information
Approval Criteria
--Equivalent level of safety
Cancellation Criteria
Grounds for canceling an Airworthiness Directive
Authority's satisfaction criteria
Amendments to Directives
Authority's power to issue amendments
Identification of amendments by suffix