summerhall mushroom
stage 3
set up incubator
PIR board on wooden frame
exhaust from chiller unit
set up innoclation room
clean walls
add door/butchers cutain
shelving
Fan filter unit
steel work table
pressure sterilisers
production equipment
pellet hopper
substrate tumbler
stage 1
set up FC 1 & 2
building FC
treated timber lengths
high guage plastic sheeting
mitre saw
galvanised wood screws
staple gun staples
climate controls
humidifier
8 disc ultrasonic mister
inline ip67 fan
water vessel
water input
float valve
john guest piping
hygrostat
fan exhausts
high powered inline fan
ducting same size as fan
CO2 monitoring
air recirculatiion
set up cold store
3x3m grow tent
thermostat
lights
shelving
chiller
stage 2
set up FC 2-8
repeat stage 1
set up refridgerated unit
Insulation board
treated wood framing
condensing unit
walk in fridge unit
general room work
24v wiring
plumbing in sink