Please enable JavaScript.
Coggle requires JavaScript to display documents.
Windmill Life Cycle Ontology - Coggle Diagram
Windmill Life Cycle Ontology
Design & Planning
Site Selection (Wind Speed, Terrain, Environmental Impact)
Design (Blade Shape, Tower Height, Turbine Type - Horizontal/Vertical)
Material Selection (Steel, Composite, Carbon Fiber)
Energy Output Calculation (Capacity, Efficiency)
Regulatory Compliance (Environmental Laws, Safety Standards)
Manufacturing & Assembly
Blade Manufacturing (Molding, Composite Material, Aerodynamics)
Tower Construction (Steel/Concrete, Load-bearing Capacity)
Generator & Gearbox Production (Efficiency, Durability)
Electrical Components (Transformers, Control Systems)
Transportation (Blades, Tower Sections, Logistics Challenges)
Quality Testing (Stress Testing, Wind Tunnel Analysis)
Installation & Commissioning
Foundation Preparation (Concrete Base, Soil Testing)
Tower Erection (Crane Assembly, Safety Measures)
Blade Attachment (Precision Alignment, Bolt Security)
Electrical Connection (Grid Integration, Power Transmission)
Safety Inspections (Structural Integrity, Operational Readiness)
Initial Testing (Turbine Start-up, Performance Monitoring)
Operation & Maintenance
Energy Production (Power Output, Grid Stability)
Monitoring (SCADA Systems, IoT Sensors)
Routine Maintenance (Lubrication, Cleaning, Wear & Tear Checks)
Repair & Replacement (Blade Damage, Gearbox Issues)
Performance Optimization (Software Upgrades, AI-based Efficiency)
Environmental Impact Assessment (Noise, Wildlife Interaction)
Workforce Training (Safety Protocols, Emergency Handling)
End-of-Life & Decommissioning
Life Span Estimation (Typically 20-25 Years)
Decommissioning Planning (Cost, Environmental Considerations)
Component Recycling (Metal, Fiberglass, Electronics)
Repowering (Upgrading with Advanced Technology)
Land Restoration (Reforestation, Soil Rehabilitation)
Waste Disposal (Eco-friendly Practices, Landfill Management)
Policy & Regulations (Sustainable Decommissioning Guidelines)