Project name - Coggle Diagram
Project name
Construction
6.0 Fabrication Sequence
6.1 Structure Shop Drawing
6.2 Piping Shop Drawing
6.3 Electrical & Instrument
6.4 HVAC Shop Drawing
6.5 Architecture Shop Drawing
6.6 Precom /Commissioning
Project Report
7.1 MCS (Master Construction Schedule)
7.2 Report
7.2.1 MH Daily Report
7.2.3 Weekly Report
7.2.4 Monthly Report
7.2.2 Manpower Plan
7.3 Cost Control
7.4 MSR
7.5 Work Order
7.6 Procurement
General
1.1. Project Contract
1.2. Project Management Team (PMT)
1.3. MOM
1.4. Correspondence
QAQC
5.1 Approved WPS
5.2 Welder List
5.3 Certificate of Tools
5.4 Final Documentation
Engineering
3.1 Basic Design
3.2 Detail Design
3.3 Vendor Document
HSE
4.1 HSE Report
4.2 HSE Chart
4.3 Emergency Response Drill Plan
MDR (Master Document Register)
2.1 Approved Procedure (Code 1)
2.2 Reviewing Procedure (Other Code)
FTP (Transmittal)
9.1 Transmittal from Client to PV Shipyard
9.2 Transmittal from PV Shipyard to Client
Material Control