Shurgard
Projects
-
Meetings
Sometimes Pre-Construction (SBD). Can have various site meetings to cover SBD / Trade Packages / Handover / Pre-Start
-
Consultants
-
-
-
-
-
Sweco (D12 London Plan Fire Assessment / Strategy for Planning) - this might be moving to Marshall Fire. ROK commission this and 360 review.
Landscape Architect (Keith Wood) - not currently under any sub-consultancy agreement (PI level only £5m) - ROK could potentially take on?
-
-
-
-
-
-
Live Projects
Hampton
Status (AF): Project on hold. Stage 4b complete. Stage 4c in progress. Fees for all Stage 4 invoiced. 85% unlikely to progress. Underground water pipe and BAPA rail line issues and cost of basement all causing major issues with the cost plan. Cost plan being reviewed with basement excluded and footprint reduced to avoid easement of the water pipe. This will be reviewed by the MIC and will hear after this (perhaps mid-April).
-
Southwark
Status (DA): Due for completion end of April / beginning of May. DA to be retained on contract basis to manage any defects / information required.
-
Sutton
Status (?): Planning determination in April (not clear on delegated or committee). Stage 4 start date not confirmed if Planning is approved. They may or may not adhere to the Judicial Review period (6 weeks).
-
West Norwood
Status: Stage 2. Pre-app 25.03.25. Stage 3 to commence if all positive. No site survey has been undertaken. Design is not quite reflective of site conditions. Needs structural / civil input and survey.
-
-
Rainham
Status: Stage 1 by 360. Shurgard have taken in house and Marcos has updated. 360 not seen revised plans. New-build on a Tesco site. No formal instruction on this yet.
-
Erith (Lidl)
Status: Back in Legal discussions. Need to wait and see how this progresses. Will require 360 to undertake a Stage 3 review (potentially revised Planning) and then Stage 4 onwards. We have provided a fee for this.
-
-
-
Client
-
RIBA 4-6: Dave / Colin
-
Fortnightly Design Team meetings: on live sites - full consultant team; GP is familiar with the process and requirements of the meetings.
Action: Tell Shurgard. Teams calls first. Dave (KG/AF/DA) then Richard (KG/AF/DA/PH) then Marcos (KG/AF/PH). Follow up with an email (separate email to Matthieu). PH to join RED Meetings + Weekly Marcos Meetings
-