Please enable JavaScript.
Coggle requires JavaScript to display documents.
process validation - Coggle Diagram
process validation
4.1 process design
4.1.1 production understanding
Define the product quality attributes
identify the critical quality attributes(CQA)
4.1.2 process understanding
4.1.3 process design of WuXi Biologics
4.1.4 process design
4.1.4.1 Quality Target Product Profile Report (QTPP)
4.1.4.2 Critical Quality Attributes (CQA)
4.1.4.3 Manufacturing Process Flow Diagram
4.1.4.4 Risk assessment for Pre-Process Characterization
4.1.4.5 Qualification of Small Scale Models
4.1.4.6 Validation/verification/qualification of Analytical Mthods
4.1.4.7 The protocal and report of Process Characterization Study
4.1.4.8 Risk assessment for Post-Process Characterization
CPP
KPP
GPP
4.1.4.9 Process design report
4.2 Process Qualification
4.2.1 Overview
4.2.2 Key elements of Stage2
4.2.2.1 PPQ MP
4.2.2.2 Prerequisites of Process Qualification
① design and qualification of the facility, equipment and utilties
② review IOPQ documents
③ selection and suirability of cleaning agents for product-contact surfaces
④ establish the program for equipment PM, instrument clibration and CC
⑤ Acquisition of preliminary process date and knowledge early in stage 1
⑥ personnel training
4.2.2.3 PPQ options, approaches and scale of studies
4.2.2.4 PPQ
① VC study
② Impurity Clearance
③Process Consistency Study
④Process Intermediate Stability
⑤Process Solution Stability
⑥DS fill, freeze, thaw and storage
⑦ mixing study
⑧ resinn and membrane lifetime validation
⑨filtration reprocessing
⑩end of production cell bank
11 E&L
4.2.2.5 PPQ protocal Execution
4.2.2.6 PPQ reports
4.2.2.7 post-PPQ RA
4.3 Continued Process Verification
4.3.1
4.3.2 Key elements of Stage 3
① Roles and responsibilities of various functional groups
②Sampling and testing strategy
③Data analysis methods
④Acceptance criteria
⑤strategy for handling OOT and OOS
⑥Mechanism for determining what process changes/trens require going back to Stage 1/2
⑦timing for re-evaluation of CPV testing plan
4.4 Process Re-validation