Please enable JavaScript.
Coggle requires JavaScript to display documents.
CAST-IN-SITU BORED PILE - Coggle Diagram
CAST-IN-SITU BORED PILE
SURVEY WORK
RIG MOBILIZED
TEMPORARY STEEL CASING INSTALLED
DRILLING UPTO ROCK STRATA
SOCKETING
BASE CLEAN & QUALITY CHECK
STEEL CAGE LOWERING
CONCRETE POURING
CASING REMOVED
Quality check of Steel Reinforcement
Flushing
Concrete Quality Check
Hopper and Tremie Pipe Arrangement
Sounding Check
Drilling with Core Barrel
Drilling Fluid - Bentonite Slurry
Drilling with Boring Bucket
Prevent sliding soil due to soil around the bore hole
Placing the rig at the location to be bored
Drilling with Soil Auger
Setting out pile points
Determine EGL
Pegged Location