When to consider for Electrification? - Coggle Diagram
When to consider for Electrification?
Qualifying Questionnaire
Equipment to Consider
Gas Turbine Compressor to HV Motor
Heating Equipment (HC based) to Electrical
GTG / GEG to RE
Fired Equipment to Boiler.
GTG (Open Cycle) to Cogen/ Close Cycle
Increased Equipment Efficiency
Lighting
Motor
DOL to VFD
Increase IE rating
Transformer
Existing Capacity (Sparing) Generation / Utility?
Flowchart
Legislation/Aspiration
What is the main agenda / Business Case?
Energy Efficiency
Improve Plant Thermal Efficiency (PTE)
Improve Energy Efficiency (EI)
Decarbonization
Changing Fuel Source (from gas to hydro)
GHG Emission Reduction
Flaring / Venting Reduction
Additional Revenue
Surplus Gas able to be freed from non-generating
Additional gas that can be free from higher efficient operation
Cost Optimization (OPEX)
Tariff Optimization
Reduction of Fuel Consumption from Higher Efficiency Operation
GTC vs MDC Operating Cost
Power Consumption (Conventional vs. High Eff. Equipment).
Digitalization / Automation
Legistlative Requirement
Carbon Tax
CAR compliance, GHG (e.g. SOX, NOX, SF6)
Commercial aspect
LLCC
ROI
Payback
Commercial Model
CAPEXLESS