When to consider for Electrification?
Qualifying Questionnaire
Flowchart
Equipment to Consider
Existing Capacity (Sparing) Generation / Utility?
Gas Turbine Compressor to HV Motor
Heating Equipment (HC based) to Electrical
Legislation/Aspiration
What is the main agenda / Business Case?
Energy Efficiency
Decarbonization
Additional Revenue
Cost Optimization (OPEX)
GTG / GEG to RE
Changing Fuel Source (from gas to hydro)
GHG Emission Reduction
Flaring / Venting Reduction
Improve Plant Thermal Efficiency (PTE)
Improve Energy Efficiency (EI)
Fired Equipment to Boiler.
Commercial aspect
Digitalization / Automation
GTG (Open Cycle) to Cogen/ Close Cycle
Increased Equipment Efficiency
Tariff Optimization
Lighting
Motor
Transformer
DOL to VFD
Increase IE rating
Reduction of Fuel Consumption from Higher Efficiency Operation
LLCC
ROI
Payback
GTC vs MDC Operating Cost
Power Consumption (Conventional vs. High Eff. Equipment).
Commercial Model
CAPEXLESS
Legistlative Requirement
Carbon Tax
CAR compliance, GHG (e.g. SOX, NOX, SF6)
Surplus Gas able to be freed from non-generating
Additional gas that can be free from higher efficient operation