Engineering Work Requests - Coggle Diagram
Engineering Work Requests
Engineering Assurance Review
Legal and Regulatory Documents
3rd Party Designs
Existing Designs
3rd Party Material Specifications
Site Visit and Preliminary Assessment
Facilities
ROW Maintenance
Landslips
Pipeline Crossings
E&I Maintenance
Commercial
Legal
Corporate Sustainability
SCADA
Technical Evaluations
SCM Support
Factory Acceptance Tests (FATs)
Contractor Registration
Vendor Registration
Technical Studies - Existing
Process Hazard Analyses (PHAs)
HAZOPS
Safety Integrity Level Studies
Fire and Explosion Risk Analysis (FERA) Reports
Electrical Studies
Lighiting
Grounding
UPS
Power System Supply
Utility (T&TEC)
Renewables (Solar, Wind)
Energy Efficiency
Instrumentation & Control Systems Studies
Civil and Structural Studies
Geotechnical Studies
Structural Integrity
Energy Efficiency
Process Studies
Simulation Reports
Flow Assurance Reports
GHG Emissions Studies
Other
Engineering Design - New
Scope Of Works
Bill of Quantities
Bill Of Services
Material Take-Offs
Long Lead Equipment
Long Lead Material
Design Specifications
Design Drawings
Engineering Sketches
Design Basis
Operating Philosophy
Preliminary Field Survey Report Stage 2
Preliminary Field Survey Report Stage 3
FEED SOW External
FEED SOW Internal
Design Lessons Learnt