CIVIL WORKS
BACKFILLING
DRAWINGS
METHOD STATEMENT
AREA OF SCOPE
QUANTITY
MATERIAL
REQUIRED MANPOWER
SUBCONTRACTORS CONTRACT AND TEST REPORTS
ITP CHECKLISTS AND WIR FORMAT
EQUIPMENTS
ASSIGNED TEAM
CO ORDINATION WITH MEP TEAM
TRANSPORT FACILITY
SAFETY MEASURES
CM,CD,PM APPROVAL
PLANNED SCHEDULE AS PER WADI OR LOCATION
SCHEDULE OF ACCESS
STEEL BOLLARDS
SUBCONTRACTOR DETAILS
INSTALLATION GUIDE
MATERIAL APPROVAL
TAKE OFF
MANPOWER ASSIGNED
Supervisor
TECHNICIAN
Helper
CHECKLIST AND ITP
INSTALLATION DATE
BEDDING AND OTHER DISCIPLINE
CO-ORDINATION
DEMARCATION
&
EXACT LOCATION
PROCUREMENT
SHOP DRAWINGS
AS-BUILT
LIGHTS AND WIRING DEVICES
SAFETY MEASURES
GROUTED RIPRAP PROTECTION
MATERIAL
SCHEDULE
SUBCON
PCC DETAILS
BEDDING
DATE OF HANDOVER
INSPECTION
MANPOWER
DRAWINGS
INSTALLATION GUIDE
SIDE DITCHES
ROAD BASE LAYERS
CONCRETE ENCASEMENT
MANHOLES