Please enable JavaScript.
Coggle requires JavaScript to display documents.
Year 8 Schema Unit 5 Resistant Materials Pewter Casting, KTC 8.9: Scales…
Year 8 Schema Unit 5 Resistant Materials Pewter Casting
KTC 8.7: Drawing Techniques
Block plans
Floor plans
Cross-sections
Scale drawings
Internal
External – rear (north); front (south); left (east); right (west).
BS standards (BS 1992:2007 + A2:2016 and subsequent updates, Building Information Modelling)
Presentation techniques
Conventions – annotations; lines; hatching; a range of symbols
Consolidation and presentation.
The conventions and requirements of 3D virtual models and plans of construction designs.
Oblique
Oblique exploded views
Freehand sketching
Isometric
Assembly Drawings
Block Diagrams
Flowcharts
Circuit Diagrams
Orthographic Drawings
KTC 8.8 CADCAM
Advantages of CAM
Disadvantages of CAM
Advantages of CAD
Disadvatanges of CAM
CAD Software
CAM machines
CAD CAM industry
KTC 8.10: The Product Lifecycle**
Raw material extraction
Manufacturing
Construction
Operation and maintenance
Demolition
Disposal, reuse or recycling
KTC 8.12: Metal, Alloys & Composites**
Ferrous Metal
Non ferrous Metal
Alloy
Composite
MDF
KTC 8.11: Manufacturing Processes**
waste material will need removing
PPE
Health and safety
Products made from this process
Hand tools
Mould
Casting
Teacher Assessment
Core Skill 1: Developing Ideas
Core Skill 2: Manufacturing
Diary of Work
KTC 8.9: Scales of Production**
Planning submission at a scale of 1:1250
For drawn details at a scale of 1:50 or 1:5
For client approval, annotation and revisions
One off, batch and Mass, JIT/Continuous
Typical products manufactured at different stages