PR1-7354 Inside Ash U003 Battery Rooms, Organogram - Coggle Diagram
PR1-7354
Inside Ash U003
Battery Rooms
SCOPE
M3-SS-2
Compliance
PPE
Signage
New Beka LED 5121
Epoxy Coating
New DC DB
Dual 63A 18Way
New Charger
230V Input from M3-EE-242D
20A @ 110VDC Out
New Isolator
Free issued
Battery Car connection
DC Isolator
HVAC
Dual Fan
DOL Panel
Exclusion
Battery bank - VTX 1M 65
M3-SS-3
New DC DB
Dual 63A 15Way
Compliance
PPE
Signage
New Beka LED 5121
Epoxy Coating
New Charger
230V Input from M3-EE-342AZ
20A @ 110VDC Out
New Isolator
Free issued
Battery Car connection
DC Isolator
HVAC
Dual Fan
DOL Panel
Exclusion
Battery bank - KPM 55P
M3-SS-7
Compliance
PPE
Signage
New Beka LED 5121
Epoxy Coating
New DC DB
Dual 63A 10Way
New Charger
230V Input from M3-EE-742AZ
15A @ 110VDC Out (standardise on 20A)
New Isolator
Free issued
Battery Car connection
DC Isolator
HVAC
Dual Fan
DOL Panel
Exclusion
Battery bank - ALCAD H50P
M3-SS-8
Compliance
PPE
Signage
New Beka LED 5121
Epoxy Coating
New Isolator
Free issued
Battery Car connection
DC Isolator
HVAC
Dual Fan
DOL Panel
Exclusion
Battery bank - ALCAD VN426-1
Battery Charger
Existing - 80A - Re-use
DC DB
Existing - 160A Dual - Re-Use
M3-SS-1
New Charger
50A @ 110VDC Out
230V Input from M3-EE-142AZ
New isolator
Battery Car Connection
DC Isolator
Free Issued
New DC DB
Dual 63A 18Way
HVAC
Dual Fan
DOL Panel
Exclusions
Battery Bank (KMP155P NiCd)
Compliance
New BEKA LED 5121
Epoxy Coating
Signage
PPE
Project Folder
PROCUREMENT
DC Systems
(TE002)
Static Power
Battery Car Connection
BTU x 4
Battery Isolator
Free Issued
Panels
(TE001)
JB Systems
DC DB x4
DOL Starters x5
HVAC
(CN002)
Chabo & Joubert
Extraction fans and ducting
Construction
(CN001)
GLTA
Stef Stocks
Masedi
Civil, Electrical & Instrumentation
Civil
(CS001)
Nako LBE
Civil Design & QC
Air Intakes
Vent to atmosphere
|Core Drills
Epoxy Coating
ENGINEERING
EIE
Obtain Cable Numbers
Drawing Numbers
Equipment Numbers
Design
Update DOL & Fan requirements
Update Cable Schedules
Update discharge points
CONSTRUCTION
Site Establishment
Workshops
Office Space
Eating facilities
Ablution facilities
Store facilities
Health & Safety
Elvis Masilela
Obtain plant emergency protocol
Identify client HSE resource
NOC
Liaise with CM/Tech lead (Site Walk)
Organogram
PM: Christian Human (16.2)
Safety
Patric Mlembelele
Engineering
Peet Bezuidenhout
Manuel Augusto
Amanda Xaki
Construction
8.1) Dirk McLaren