PDU POWERMON
Replacement Strategy
Impact Analysis
Migration planning
Minimum disruption
How to inform customer
Customer Responsibilities
Fallback plan
External Installation (Limited Space)
Reuse CET boards??
Costing
Software
Hardware
Support/Maintenance
Customization
Training
Maintenance
SLA
PDU3A&4A (5&6)
Turnaround time
Spares
On-site Support
Remote Access
Contractors
Enthu (Jeff), 0122248948
Api (Terence), 0122780608
Litech Electrical (Mervin), 80788028
Internal Support
Identify Designated Owner
Documentation
System Maintenenace
Re-training
Features of BCMS
Meter reading adjustment possible? (New System?)
Main source measurement (Incoming from UPS)
Alerts
Power Quality Monitoring (New meter?)
A&B Source Loading Warning
PDU1&2
Overload
if switchover :red_flag:
Customer Subscription vs Actual
How the System works?
Data Collection
Buffering
A&B Sources Backup
Different between Schneider and CET setup