Please enable JavaScript.
Coggle requires JavaScript to display documents.
Configuration Management: 4406 Chp 2 - Coggle Diagram
Configuration Management: 4406 Chp 2
2 types of maintenance
Planned
Governed by Maintenance, Material, and Management (3-M)
Logged in SKED(scheduling tool for preventative maintenance)
Source for small amount of your orders; majority is HazMat (consumable money)
Unplanned
Time-sensitive and source for most of your orders; majority is EMRM $ (repair) money)
Logged in OMMS-NG until corrected
COSAL
resides on ships OMMS-NG
contain APLs & AELs
delineate range and depth ship must maintain to optimally support ship's configuration
AEL
Lists consumable equipage that support shipboard operations.
APL
repair parts and other pertinent information for installed equipment or components
Record Id #
machine-assigned # to identify a specific entry in the APL/AEL record in the Weapons System File (WSF).
Q COSAL
MINIMUM Q-in-use in custody of ENG pg 3-4
Check Q in use immediately
Nuclear Outfitting Cosal is an easier way to manage the program
DEF
Maintaining the list of “right parts to order” is Configuration Management
Get customer to order the correct part. (Training)
Maintain the list of correct parts for customer orders (COSAL)
3-Way Match to Order the Correct Part
Part # on equipment= in manual= in OMMS-NG
APL doesnt match other 2?
the SCLSIS Loop takes over through a Fleet COSAL Feedback Report
FCFBR should be submitted by work center for all COSAL errors except Not Carried or Not Listed parts
Automated Shore Interface (ASI)
Updates ship’s database
provided and uploaded by shore based contractors (~every 60 days)
Review jsl 311, 325 for slide 11