B-01 Project Management Plan
B-03 Design Management Plan
B-04 CDR Design Report
B-08 Interface Management Plan
B-11 Quality Assurance Program
B-12 Design Quality Plan
C-01 LRV Clearance Envelope
C-02 LRV Swept Path Analysis
C-03 Substitution of Standards List
C-05 North American Ergonomic Dataset
C-06 Obsolescence Management Plan
C-09 LRV Ingress and Egress Flow Study
C-10 Platform Interface Study
C-11 LRV Exterior Design and Finishing Scheme
C-13 Total LRV Mass Report
C-16 Duty Cycle Report
D-01 Systems Engineering Management Plan
D-02 Requirements Management Plan
D-03 Systems Integration Plan
D-06 System Design Description
D-12 Master Test Plan
E-09 Maintainability Program Plan
E-11 Preliminary Hazard Analysis
E-13 Failure Modes, Effects, and Criticality Analyses
E-14 Sneak Circuit Analysis
E-16 Safety Data Sheets
E-17 Fire Hazard Analysis
G-03 Software Development Process
G-11 Software Project Management Plan
G-12 Software Quality Assurance Plan
G-13 Software Configuration Management Plan
G-14 Software Verification and Validation Plan
G-18 Software Design Description
G-19 Database Design Description
H-01 Electromagnetic Compatibility Plan
I-19 List of Required and Recommended Special Tools and Diagnostic Test Equipment
I-21 Functional Descriptions, Drawings, and Diagrams of All Diagnostic Test Equipment
J-01 ATC System Conceptual Design Report
J-08 ATC Qualification Test Procedures
J-09 ATC Qualification Test Results
K-01 Electrical Conceptual Design Report
K-11 Ground Brush Design Report
K-18 Electrical Qualification Test Procedures (Qualified)
K-19 Electrical Qualification Test Results (Qualified)
L-01 Propulsion System Conceptual Design Report
L-09 Load Effort Distribution Design Document
L-10 Mandatory Braking Trigger Report
L-13 Spin-Slide Correction System Design Document
L-14 Load Compensation System Design Document
L-19 Propulsion System Contactors Document
L-20 Speed Sensor Design Document
L-22 Propulsion System Qualification Test Procedures (Qualified)
L-23 Propulsion System Qualification Test Results (Qualified)
L-24 VPI Inspection Process
M-01 TCN Conceptual Design
M-05 TCN Qualification Test Procedures (Qualified)
M-06 TCN Qualification Test Results (Qualified)
N-01 Communication Systems Conceptual Design Report
N-14 Communication Systems Qualification Test Procedures (Qualified)
N-15 Communication Systems Qualification Test Results (Qualified)
O-01 MDS Conceptual Design Report
O-07 Automatic Passenger Counting Design Report
O-08 Event Recorder Design Report
O-09 Train Operator Display Functional Specification Document
O-10 MDS Qualification Test Procedures (Qualified)
O-11 MDS Qualification Test Results (Qualified)
P-01 Carbody Conceptual Design Report
P-17 Carbody Qualification Test Procedures (Qualified)
P-18 Carbody Qualification Test Results (Qualified)
Q-01 Interior Conceptual Design
Q-05 Interior Layout Design Plan
Q-07 Flooring Design Plan
Q-14 Passenger Area Mock-Up Specification
Q-16 Interior Qualification Test Procedures (Qualified)
Q-17 Interior Qualification Test Results (Qualified)
R-01 Operator�s Cab Conceptual Design Report
R-06 Operator�s Cab Glass Tint Colour Schemes Report
R-07 Master Controller Proposal
R-08 Monitoring Screen Proposal
R-12 Operator�s Cab Qualification Test Procedures (Qualified)
R-13 Operator�s Cab Qualification Test Results (Qualified)
S-01 HVAC Conceptual Design Report
S-05 List of Equipment Ventilated by Forced Air
S-06 Equipment Ventilation Air Filters Design
S-08 HVAC Qualification Test Procedures (Qualified)
S-09 HVAC Qualification Test Results (Qualified)
T-01 Door Entrance System Conceptual Design Report
T-05 Operator�s Console Passenger Door Control Plan
T-08 Door Entrance System Qualification Test Procedures (Qualified)
T-09 Door Entrance System Qualification Test Results (Qualified)
U-01 Lighting Conceptual Design Report
U-05 Lighting Functionality Plan
U-06 LRV Exterior Lighting Design Scheme
U-07 Lighting Qualification Test Procedures (Qualified)
U-08 Lighting Qualification Test Results (Qualified)
V-01 Pantograph Conceptual Design Report
V-05 Pantograph Clearance Study
V-06 Pantograph Contact Force Study
V-07 Pantograph Qualification Test Procedures (Qualified)
V-08 Pantograph Qualification Test Results (Qualified)
W-01 Coupler Conceptual Design Report
W-12 Coupler Qualification Test Procedures (Qualified)
W-13 Coupler Qualification Test Results (Qualified)
X-01 Bogie Conceptual Design Report
X-05 Swing Test Plan
X-07 Suspension Design Package
X-08 Axle Load Diagram Report
X-10 Stress Analysis Plan
X-14 Bogie Qualification Test Procedures (Qualified)
X-15 Bogie Qualification Test Results (Qualified)
Y-01 Auxiliary Braking System Conceptual Design Report
Y-05 Friction Braking System Design Plan
Y-09 Auxiliary Braking System Qualification Test Procedures (Qualified)
Y-10 Auxiliary Braking System Qualification Test Results (Qualified)