SETTING - OUT
Screed Rail
How it was managed
Set out and supervised levels to a tolerance of +-5mm
Using Spirit level to verify
Outcome
Checked & verified by an experienced Engineer.
Aim
To set out 50mm thk mortar from existing abutment to bottom of Cill
Pre-demolition
Aim
To determine back of Proposed Cill units
Setting out points from drawings
Spray dig lines
Install scaffold bridge
outcome
Demolish and install scaffold bridge
BT Survey
Motive
Survey existing levels
outcome
Existing levels to be re-used again