Please enable JavaScript.
Coggle requires JavaScript to display documents.
Installation of Laminate Flooring, Screenshot 2022-03-01 141803 , …
Installation of Laminate Flooring
Measure the room
Get the right amount of materials
Marks the planks and make the cut
Use the cut off section to tighten up the joints
Make sure that everything locked together
Install the transition and leave the quarter round to the end
Use caulking to make more presentable
do touch -up work
clean up the mess and job done
Drilled and install the metal track
Hammer the transition piece right into the metal track
Final touches cocked around the trim
Clean the floor
Place the underlayment first
Choosing the direction of the floor
Use miter saw cut few pieces of laminate plank for spacing
Place the spacers at the starting point
Cut off the tongue on the first row of planks
Modify the trim going around the closet
10.Mark the planks to be cut with tape
Cut the profile for the plank
2 more items...
Because it's really hard to see if mark on the laminate piece
Can cut down on a chipping from the laminate edge
To be a moisture barrier
Keeps laminate floor dry