Please enable JavaScript.
Coggle requires JavaScript to display documents.
2B2-SS-01 MV SGR PR1-6751 - Coggle Diagram
2B2-SS-01
MV SGR
PR1-6751
MV Switchgear
Frame
IED Training
Collect and install
IRPs
Collect and Install
Auxiliaries
RCP
New
AC DB
Modify
DC System
BTU
New
Isolator
New
Batteries
New
MCC Bucket
existing on new MCC
JBs
New
E&I Panel
Re-Use existing
Annunciator
New Omni panel
DC DB
Replace
Metering Panel
existing panel to be integrated
Construction
Core drilling
MV Cables
TRFR Boxes
LV Cables
Marshalling
Civil
Deep saw cutting - trfr bays
Painting and Grouting
Mobile Sub
n-1 for 2 weeks prior to shut
Loads
Admin Building
SMC Complex
Sastec
2B2-EE-117B Trfr
Use 2B2-EE-114B trfr