Please enable JavaScript.
Coggle requires JavaScript to display documents.
Energy Saving - Coggle Diagram
Energy Saving
Team
Jim Mullins
Richie Ryan
Craig Hannon
Adrian Daly
Fintan Mullins
???
Evaporators
CIP
Heat regeneration from concentrate line during rinse steps
Lower Steam Use
Water Tech to advise on temperatures.
Increase PHE Temp SP for CIPs
Production
Stabilisation linked to Dryer On Water Step
See Dryer to Water comments.
Hot-Standby Steam Use
Evaporator to return to vacuum step when not in use
Vacuum test based on Rate of change of vacuum.
Better Use of Pre-concentrators
Increase outlet density SP when using with Evaporator's 4 & 5
Investigate use of Evaporator 4/5 1 x calandria production.
Investigate use of 1 x calandria Evaporator production.
Insulation of Evaporators?
Dryers
CIP
Tanks heating efficiently?
All return chemicals heat returning?
Reuse of Acid Chemical
Water Tech to investigate.
Review Dry-Out times
Production
Start-up Efficiency
Dryer to Water
Link to Evaporator Stabilisation step
Softkey to acknowledge Evaporator Ready
Evaporator unable to start stabilisation when Dryer not "On-water".
Look at link to Dryer to allow
Timer to return to Hot Standby
Dryer to Hot standby
Timer - Return to Cold Standby
Lower temperature in Hot Standby
Pasteurisers
CIP
Production
CIP Centres
Heating of Water during washes?
Temperature of CIP Tanks
Possibility to lower?
Temperatures of CCA, CCB & CCC all different
Tanks insulated??
Planning
Planned for efficient production & CIP times
Metric to represent this.
Time of year best to make savings?
January - March
September - December
RO Plants
CIP Time of RO1 - Reduce to match RO2