Please enable JavaScript.
Coggle requires JavaScript to display documents.
LOD - ELEK - Coggle Diagram
LOD - ELEK
Projects
Power demand
building scale
(Roombook?)
Power calculation
(Load balancing)
EL cable and CB calculation/selection
Conduit sizing
Trunking sizng
Cable tray sizing
Busbar sizing
Voltage drop calculation
Genset selection
Exhaust pipe
Smoke filter
Oil supply
Ventilation
Acoustic for genset
(basic rule)
Capacitor bank calculation
From Substation
1.7 LV surge protection device
Principle, SPD selection & rating
1.6 LV protection, measuring CT/ VT selection
Primary/ secondary rating, accurancy selection, burden calculation…
1.5 Power factor improvement and auto regulation
PF calculation/ capacitor, reactor, CB, cable selection.
1.4 Short circuit calculation
Method of calculation according to IEC 60909
1.3 Relay protection & coordination
50/50N/51/51N/ 27/27I/27R 59 87 86 25 ….
1.2 Transformer/ Generator/ Motor… protection
1.1 Radial System/ Loop System
Earth electrode calculation
Transformer and MV switch gear selection / configuration
Power estimation
(urban scale)
Lightning protection
(decisions/chosen type)
Conventional Faraday type
(recommended)
ESE type
(less recommended)
DiaLUX calculation
Aesthetic in choosing and layouts the lighting fixture
CANECO calculation
KNX
Smart Grid
(Infra & Industrial)