Initial Idea concept ticket created!
Customer request
Product Triage process Revenue/resale etc Consult with CSO
PMO Ticket created Link to Product Idea
PMO must have collateral collected by idea and any supporting documentation including functional and non functional requirements. A blank template estimate sheet should be uploaded with the PMO and PMO checklist updated.
PO creates the PMO
Create new Estimation template -
https://servelec-edu.atlassian.net/wiki/spaces/TC/pages/1380745266/HL+Estimation+Template
PO creates the EPIC line items (product breakdown structure) columns A, B & C with as much detail as possible
This may need technical help - this must be Architect - this is on adhoc basis and routed through Chris Johnson through Architecture mailbox or direct to Chris J
PO Adds all EPICS from estimate to Rio board with product line set to Healthcare and link these to PMO ticket
PO also creates assumptions, risks and dependancies
PO liaises with CSO Vicky Mudd or assigned Safety case officer
Save to
https://servelecgroup.sharepoint.com/:x:/s/DEP-ProductEstimations/
Saved location and put it in description in PMO
Transition PMO ticket to Ready for High Level estimation
IF Change after this point - If approved on estimation sheet- Just be a change control - Change control sheet in Confluence
Product line needs to be set to Healthcare, Component must be Rio don't set Interop.
Assignee should be CJ
Architect/Development sign off up to 50 days - 50 - 100 DG, over 100 days goes to Martyn.
Architect sets to Ready for review
Review session with PO DG and DS
VM as optional
Ready to progress by Dan or Lee - managed by Stuart from this point on
PO PMO process largely dev and Standard operating procedure from this point on
Architect team set it to 'IN Estimation'
IF CHANGE to a PMO Update PMO to say a change has been made - discussion point if it needs PMO adjustment - PMO is either Ready to Progress
Ready to Review
PMO should link back to idea and have links to EPICS on Rio Healthcare board, with estimation sheet and description in PMO
rejected
NHS Driven mandatory
Triage via Prod mgt & Consult with CSO
DDR - Fault
Small DDR team
Gets done linking to
existing
PMO-48
Large - Needs PMO
Other/eg. Project - Triage process Prod management
Small
Large - Product triage process & Consult with CSO
Rejected
Sales bid