00-Coordination Infrastructure Project, Coordination Elements, Data…
00-Coordination Infrastructure Project
Requirements
EIR
AIR
Bxp
Modeling Strategy
Quantities take off methodology
Contract
Scope of work
Check Drawings & Models
Received IFC
Check IFC Drawings for all Disciplines Infrastructure
Quantities
IFC Revision
IFC Comparing Drawings and Models
Fences Model/Drawings for Shop drawing
ARC
STR
ELECTRICAL KOFFERE
MECHANICAL VALVES
IFC Details
Profiles
Master Layout with all Utilities rooms and Details
Check Design Technical IFC
Check Compatibility of drawing with models
Quantities from BOQ
SD list
Specs
Coordination BIM Process
Defines Clash Strategy
Clash Matrix
View Points naming
Export Setting
Spacing matrix
Approved material Submittals
Check UTC plan and Section
Modeling Strategy
Civil 3D Networks
Civil 3D Catalogues
Revit Above ground levels
Risers
Check Modeling Levels
Road Crossing
Thrust block
Master layout with coordinates
Coordination meeting (Workshop) for construction and problems
Time Schedules
Construction Sequencing
Engineering Period
Delivery Dates
Civil Models
Utility Corridor Plan and Section
Modeling Levels
Wet networks
Water
Pipes Diameters
Fitting
Valve chambers
Drain chamber
Air Chamber
Flow control valve
Flow meter valve chamber
Pressure transmitter chamber
Appurtenance
Service Connection
Buried gate valve
Surface box
Fire Fighting
Pipes
Fire Hydrant
Valves
Elbow
Sewage
Pipes Diameters
Structures
Details for Manholes
Storm
Pipes Diameters
Structures
Irrigation
Pipes Diameters
Appurtenance
Service Connection
Buried gate valve
Surface box
Fitting
Valve chambers
Drain chamber
Air Chamber
Flow control valve
Flow meter valve chamber
Pressure transmitter chamber
GAS
Material of pipes
Thrust Blocks
Dry Networks
Medium Voltage
Squared Pipe according to number of cables
Crossing Roads for 2 cables 1 spare
Low Voltage
Squared Pipe according to number of cables
Pillars
Koffere
Transformers
Crossing Roads for 2 cables 1 spare
Telecommunication
Micro Duct
Main Zone Cabinet
Zone Cabinet
Smart Cabinet
Cabinet
Manholes
Handholes
Street Lighting
Pole Foundation
Cable as Pipe
Civil Engineering
Roads
Ground Level
Neutral Ground level
Assembly
Subassembly
Curbs and Island
Survey
Material Submittals
Deliverables
Civil 3D models
Details for Construction
QTO
Shop Drawing Plans and Profiles
C3D Catalogues
Revit Models
Surface Grading C3D
Electrical Equipment Model
Poles
PIllars
Camera
Z, S Cabinet
Fence model
Inspection Chamber
Center IC in Car gate
Water connection
nearest to Villa
FTB
koffere
RVT Building Mass
Roads C3D
pavement
Roads
Island
Villa Model
Arch Model
Str Model
MEP Tie in for Infrastructure
Revit views
3D Navisworks Export
3D Shared-Views
Parts
Milestone
Phase
WIP 3D
Parts
Milestone
Phase
2D plans
Levels of Revit
Lowest Levels & contour
Middle level & contour
Highest Level & contour
Mechanical Rooms
Drain valve
Air Valve
Flow control valve
Flowmeter valve
Pressure transmitter chamber
Information Exchange from Client
Master plan Layout
Revit Villas with Layout
Revit Fences with Layout
Contain
IC
Water Connector
Koffere
FTB
Car Gate
Human Gate
Roads
Contain
Road Model
Pavement Model
Pavement Layout with Car Entrance
Landscape & Lagoons
Electrical Rooms
Distributer Room
Transformer Rooms / RMU
Tanks Rooms
Coordination Elements
Sewage
Curbs should be far from body of manhole
Preferred manholes to be in the middle of street
inspection chambers would be in the middle of car gate
Catch basin would be in the lowest point and should it's cover away from road
Manholes should be away of street island
Acute angles is refused in model
Water
Water meter would be in the corner of the building according to water routing in building
Water chambers should be check covers according to street pavement
Fire Hydrant would be away from gate of any building
If fitting is ductile you should looking forward to Thrust block
Low Voltage
Crossing road should be with depth of real
Pillars should be coordinated with crossing roads
Number of cables in duct bank
Description of cables inside duct bank
Road Model
Island
Parking area
Pavement and Curbs
Ramps
MD Voltage
Description of cables inside duct bank
Number of cables in duct bank
Street lighting
Street lighting poles should be away of any car gate and away of any obstacle
Telecommunication
Manholes and holes should be coordinated with ZC and MZC
Landscape / Green area
Data Shortcut
Type of data shortcut
Reference/As Link
Promote/As Exploded Link
1- Set working folder
2- New Shortcut Folder / or set folder
3- Associate Project to current drawing
4- Create Data Shortcut
Note: You can Edit Style label only for shortcut drawings unless to click Promote
5-Save Editing in drawings
6-Synchronize other drawings
Priorities
Road Model
Main Road
Pavement
Island and Curbs
Sewage
MD Voltage
Water & Fire
Irrigation
Low Voltage
Telecommunication