WO Use case
Production Target
Monthly production(120L)
Capacity based production(96L)
Variantwise production
Var Name(VAR4)
Production Target(18L)
Settings
Category
Cycle time(2 Sec)
Variant
Mention category(Cat1)
Cycle time decided based on Category
Priority(1)
Batch Production Qty(60000)
No of Fixtures(3)
Machine Applicable
Each Machine Settings
Startup Time(10 min)
Changeover Time(10 min)
Each day 6 am / manually
WO Batch Generation
Daywise WO
WO Batch Generation
Output(Dont check Repair Time)
1
BatchSeqNumber(B202101001)
Variant(VAR1)
Fixture-VAR1-1
Machine-M1
Target Parts(60000)
Cum Target(60000)
Total Time(210)
Allocated:NO
Priority Seq:1
Priority Seq:1(Machinewise)
Completed:No
2
BatchSeqNumber(B202101002)
Variant(VAR1)
Fixture-VAR1-2
Machine-M2
Target Parts(60000)
Cum Target(120000)
Total Time(210)
Allocated:NO
Completed:No
No of btaches:0
Priority Seq:1(Machinewise)
If the fixtures are not there
Go for next Machine
Daywise WO
Batchwise List
All Detail
Refer a Monthly Batch
BatchSeqNumber(B202101002)
Variant(VAR1)
Fixture-VAR1-2
Machine-M2
Target Parts(60000)
Cum Target(120000)
From Time
To Time
Split the btach if shift chamgs
BatchNumber B2021-01-20-001
Against Monthly Btach-put allocated
Update against WO each batch
This is developed already
Mention batch number
Update each batchseq as completed